Replicable catering building with hybrid structure for Defence

The final touches are being put to a new catering building for military personnel based at Kwartier Majoor Housiau in Peutie and their guests. It is an almost identical copy of a similar building completed in 2022 at Kamp Koning Albert in Marche-en-Famenne. This single-storey building of approximately 60 m² was designed by MODULO architects and features a hybrid structure comprising steel, in-situ concrete and masonry. Steel contractor TMI, which was already involved in developing the prototype in Marche-en-Famenne, is also part of the team in Peutie.

The catering building erected in 2022 at Kamp Koning Albert in Marche-en-Famenne served as the prototype for subsequent buildings, including the one in Peutie. (MODULO architects, image: Corentin Haubruge)

The new building is intended for social use and comprises a large restaurant, a kitchen with cold storage, recreation areas, offices, plant rooms and sanitary facilities. It has a number of distinctive features that give it an unusual architectural appearance for this type of project, making construction complex. These include in-situ concrete walls cast using special formwork to create a wavy effect; square-section steel columns, custom-made in TMI’s workshop to achieve sharp edges, unlike the rounded columns usually used; mixed connections, with certain beams bolted on the inside and welded on the outside to achieve a consistent aesthetic; corner columns laterally anchored with welded beams to create a ‘floating’ visual effect; a large structure made from cold-galvanised sections for displaying the restaurant menu; and no internal vertical wind bracing, an arrangement compensated for by tensioned cables and wavy concrete walls … As a result, stability during assembly proved a critical consideration, with temporary bracing and reinforced reinforcement ensuring safety until everything was permanently anchored.

A new catering building for military personnel based at Kwartier Majoor Housiau in Peutie and their guests is taking shape. (MODULO architects, image: Corentin Haubruge)

Careful planning and coordination

Beyond the technical details, the challenge in the projects at Marche-en-Famenne and Peutie lay in the complex interplay between the steel, concrete and masonry elements, which called for careful planning and coordination. The columns were wrapped, for example, to prevent damage during subsequent construction work. 

Joachim Du Four, Project Manager at TMI, is overseeing the project in Peutie (Vilvoorde): “Production of the steel structure, weighing approximately 200 tonnes, took place at our workshops from August to November 2024, but work on site could not really get under way until February this year. Assembly is now being completed. Given the size of some of the components, this has required temporary structures and fairly complex logistical arrangements.”

The building has a hybrid structure comprising steel, in-situ concrete and masonry. (MODULO architects, image: Corentin Haubruge)

Prototype provides a basis for further projects

In 2022, Arnaud Tourny, Project Manager at TMI, had the honour and pleasure of helping to build the first building in Marche-en-Famenne, which in a sense served as a prototype for subsequent examples. “The changes made in Peutie and at a third site, where TMI is not involved, are minimal and mainly concern minor connections and paint finishes. At Marche-en-Famenne, assembly was delayed by winter weather, pushing the paintwork back by two to three months. This led us to decide that, for subsequent projects, most of the painting would be done in the workshop.”

The replicability of the building concept should in principle deliver cost efficiencies, shorter lead times and better process management. Nevertheless, the success of each individual project depends on collaboration between the architect, the engineering consultancy (in this case Lemaire Ingénieurs), the main contractor, who may differ from site to site, and the subcontractors involved. TMI has certainly made its mark and hopes to contribute again if Defence decides in future to build new catering facilities at other military bases …    

Question about this story? Ask your question

Who worked on it

Horecagebouw Defensie Vilvoorde in Vilvoorde

  1. architectMODULO architects
  2. steelwork contractorTMI
  3. engineering consultancyLemaire Ingénieurs

Keep following this

Get an email when a new story is published. No account needed.

What you follow
  • ProjectHorecagebouw Defensie Vilvoorde
  • SubjectConstruction projects
  • CompanyMODULO architects
  • CompanyTMI
  • CompanyLemaire Ingénieurs
Share this article

Advertisement

Follow Bouwen aan Vlaanderen

Follow

Follow a project or company and you’ll receive an email whenever a new story appears. Follow a theme or topic and you’ll receive a weekly roundup. No account or password needed: every email includes a link to what you follow.