27,000 square metres of offices and retail space, close to one of Roeselare’s main thoroughfares: that is R.Plaza. Four multi-purpose buildings with a compelling sustainability story in the broadest sense of the word. Sustainability, flexibility and attention to detail are the three pillars on which the concept is based.

“A complex that does justice to its location.” That is how Olivier Ciers of West Flanders-based Steenoven describes R.Plaza. Building A is complete, while blocks B and C are on the way. The fourth volume is in preparation. Each part has been designed with the same precision. You can see this, for example, in the number of parking spaces. “We carried out studies to ensure there would be ample parking for the retail units and offices,” says Ciers. 

Integrating nature into the project and its surroundings was an important consideration. Designed by landscape architects De Witte Kamer, the green buffer is a concrete footpath. Native plants and trees alongside the path provide pleasant greenery. “Originally, this was not ecologically valuable land, just an old development with asphalt and a field with three large willows. Those trees have been retained and are thriving in their new surroundings.” 

Integrating greenery into the project and its surroundings was an important consideration.

Concrete and steel structures

From a construction perspective, the overall design is highly ingenious. The architectural precast concrete panels by Decomo have a distinctive relief, allowing the light to create a unique play of shadows. The formwork was therefore not flat, and required special self-compacting concrete that could flow smoothly into the relief. This keeps the façade as flat as possible, without an excess of air bubbles or honeycombing. “It takes the whole project to a higher level,” says Ciers. 

A white-painted steel structure is attached to the exterior. In the original design, it was intended solely to support signage and solar shading. During further development, however, it was decided to turn it into a terrace as well. “We thought it would be a nice extra, as the timber terrace gives the building more warmth and offers office users a little added luxury. But it did make the whole project more complicated. We suddenly had to take into account the limited depth of the horizontal profiles that housed everything, including the drainage. We opted for Jettydeck profiles by Staco, into which the timber was anchored. The stability calculations also had to be revised to account for the greater weight of the terrace floor and glass balustrades,” says the project manager. 

The extra challenge lay in the concrete frame, with continuous internal columns onto which beams and floor units were dry-assembled, with the structural topping tying everything together. Valcke, a precast concrete contractor from Vlamertinge, worked with the team on this. The insulation, inner and outer panels, and secondary structure are all suspended from this frame. At the terraces, everything is interwoven: concrete panels, steel, waterproofing and insulation. This posed an installation challenge. Using precast concrete elements meant that no timber or concrete went to waste on site. It also drastically reduced the construction time.

The steel structure was originally intended solely to support signage and solar shading. It now also forms a timber terrace.

Extensive choice thanks to dry construction systems

Some structural elements, such as the concrete columns, were deliberately left rough and unfinished. This gives the building extra character. “Our clients take this into account when designing their interiors. Or they go a step further and leave the floor units exposed as the ceiling,” says Olivier Ciers. Inside, every business has plenty of freedom of choice, something quite unusual for a mixed-use building, made possible by the use of dry construction systems such as a raised floor. The frame structure, with 8 by 8 metre bays, also makes it possible to lay out each space flexibly using walls and units, now and in the future.  

It was not just the aesthetic details and freedom of choice that mattered. Sustainability was also considered, with BREEAM quality standards in mind. “Our energy performance exceeds legal requirements: we have provided good insulation, the LED lighting is linked to motion and daylight sensors, and we opted for Daikin heat pumps,” says Olivier Ciers. In other words, Steenoven has given careful thought to R.Plaza’s role in society: a future-proof building designed to last for generations.      

De steenstrips worden op de isolatie verlijmd.

The formwork has been kept as flat as possible, giving the design a striking finish.

Een zakelijke vraag aan DECOMO? Get in touch

Who worked on it

R.Plaza in Roeselare

  1. architectonische prefabbetonpanelenDecomo
  2. landscape architectsDe Witte Kamer
  3. prefabbouwerValcke
  4. Jettydeck-profielenStaco
  5. heat pumpsDaikin

Keep following this

Get an email when a new story is published. No account needed.

What you follow
  • ProjectR.Plaza
  • SubjectConstruction projects
  • CompanyDECOMO
  • CompanyDe Witte Kamer
  • CompanyValcke
  • CompanyStaco
  • CompanyDaikin
Share this article

Follow Bouwen aan Vlaanderen

Follow

Follow a project or company and you’ll receive an email whenever a new story appears. Follow a theme or topic and you’ll receive a weekly roundup. No account or password needed: every email includes a link to what you follow.