Many social homes in Flanders are outdated and therefore do not offer the level of energy comfort required today. The apartment block at Rozendreef 167 in Aalst was no exception. An extensive makeover has provided a solution, as well as additional housing.
The social apartment block, which dates from 1981, had seen better days. As it also contained screed with asbestos adhesive and several asbestos boards, it was decided to strip the structure back to its concrete frame. “Only the floor slab and columns were retained,” says Jurgen Voorspoels of PIT Antwerpen, which carried out the makeover through subcontractors. “Both gable ends were widened with their own foundations and connected to the existing eight-storey structure. This increased the usable floor area to 5,280 m², enabling us to increase the number of apartments from 48 to 61 and provide a retail unit of around 58 m² on the ground floor.”
Simple yet tasteful finishes

A white steel balustrade ensures safety while also giving the building
a bold look.
The new and old sections have a similar layout, with Gyproc internal partitions and Ytong masonry external walls. The upper floors are finished with a combination of white render and aluminium external joinery. The ground floor is clad in white concrete panels with an anti-graffiti coating. Residents can now enjoy the sunshine too, as every apartment has a generously sized terrace in white architectural concrete. A white steel balustrade ensures safety while also giving the building a bold look.”
Roof renewal brings challenges

The apartments have been refurbished internally to meet the latest insulation and fire safety standards
The apartments have been refurbished internally to meet the latest insulation and fire safety standards. “Although they are heated conventionally, with gas, energy bills will be significantly lower,” says Jurgen Voorspoels. “The client opted for a high-performance communal condensing boiler, combined with individual distribution via satellite systems. The building services are housed in a plant room beneath the roof.

The new and old sections have a similar layout, with Gyproc internal partitions and Ytong masonry external walls.
The roof itself was also completely renewed, with EPDM and a 14 cm layer of PIR insulation. This was probably the biggest challenge of the project. Three telecoms operators and three radio stations have transmission masts there, which had to remain operational at all times.”
A finished project with tangible benefits

Residents can now enjoy the sunshine too, as every apartment has a generously sized terrace in white architectural concrete.
The project was a perfect fit for PIT Antwerpen, part of the Eiffage group. The company specialises in renovating social housing complexes and modernising apartments for various housing associations in Flanders and the Brussels-Capital Region. “Technically, the challenges were limited to what is normally encountered on projects of this kind,” explains Jurgen Voorspoels. “The deadline, however, was extremely tight because residents had to move elsewhere temporarily. That is why we carried out the renovation in two phases. First, we renovated a third of the building, leaving 23 apartments ready and allowing most of the original residents to move back home. We then began work on the largest section, which is scheduled for completion this spring. All the work is progressing very smoothly. The finished project will certainly be a real asset to the neighbourhood, and of course to the residents, who will have a comfortable home in a prestigious building fit for the future. Thanks to its clean architectural lines, it no longer looks like a social housing complex, but like a tasteful building in which it is a pleasure to live.”
Een zakelijke vraag aan PIT Antwerpen NV? Get in touch
Companies in this story
Keep following this
Get an email when a new story is published. No account needed.
- SubjectConstruction projects
- CompanyPIT Antwerpen NV