Construction projects

RPC bpi group | Zele: A touch of London in Zele

RPC bpi group | Zele: A touch of London in Zele

The dated office complex of RPC bpi group in Zele had long ceased to reflect the image of a thriving, publicly listed company. Renovation was called for, but proved too costly and inefficient. The packaging specialist therefore decided to build a brand-new premises on its existing site. The result is an understated building with few embellishments, whose detailed architecture nonetheless perfectly conveys the British multinational’s forward-looking outlook.

RPC bpi group Zele

The red tones of the bricks are a perfect match for the black aluminium windows and doors.


RPC bpi group has been the global market leader in the production of packaging films for many years. In Belgium, the company has four manufacturing facilities: in Ghent, Eke, Roeselare and Zele (formerly Formipac). The last of these sites has recently undergone a transformation. The new office building replaces the existing premises, which will eventually be demolished.

Inspired by London

At the client’s request, Bofa Architects designed an extremely understated, rectangular building with a gross floor area of 1,350 m² across three storeys. “The intention was certainly not to make a grand architectural statement,” says architect Steven Winderickx. “RPC bpi group wanted an understated, flexible office complex with an open-plan layout where everyone could enjoy working. As the packaging specialist is a publicly listed company based in London, we looked to London style for inspiration. This is reflected in the choice of materials.

The vertical balusters of the stair railing feature integrated LED lighting in RPC bpi group’s logo colours.

For the exterior façade, we chose Wienerberger’s Marono series, an elongated, textured brick measuring 288 x 90 x 48 mm, in red. A thin, recessed joint in the same colour creates a clean look. The red tones work perfectly with the black aluminium windows and doors. We also added a few small architectural details to give the building extra character. A black aluminium canopy sits above the entrance, while the sun terrace on level +1 has black aluminium solar shading. The structure consists of a concrete frame with a flat synthetic roof fitted with PV panels. A section of green roof has been installed beside the sun terrace, which adjoins the flexible lunch area. The result is a no-nonsense building that forms a balanced whole and has a solid architectural presence.”   

Transparent, with playful touches

Inside, the extensive use of glass partitions makes for a highly transparent building. “We did, however, add a few fun, playful touches,” says architect Steven Winderickx. “The stair railing, for example, has vertical balusters with integrated LED lighting in RPC bpi group’s logo colours: black, grey and orange.”

RPC bpi group Zele

The extensive use of glass partitions creates a sense of transparency inside.


The ground floor houses the reception desk, a flexible space, several meeting rooms and a few offices. The first floor is laid out as an open-plan office and also includes a large meeting room. Level +2 contains the flexible lunch area with sun terrace and roof garden, another meeting room and several more offices.

A call for creativity

Dero Construct from Zele brought the architects’ plans to life. The class 7 contractor handled the structural work itself, including formwork and bricklaying, and also subcontracted the interior finishing. “One challenging aspect was the parapet walls on the coping at the roof edge,” says project manager Tom Van Den Branden. “To tackle this, we used a system that allowed the parapet walls to be fixed directly to the coping without penetrating the roof waterproofing. The black precast concrete staircase was also not straightforward to build.

The sun terrace on level +1 is fitted with black aluminium solar shading.


We started with white cement for the concrete mix, adding 6 % anthracite pigment to achieve the black colour. The stair railing was another ‘special’. The challenge was not so much making it as installing it as a whole. It turned out that the only way to get the stair railing into the building was through the smoke vent above the stairwell. So this was a project that called for some creativity. Nevertheless, we achieved exactly what we set out to do and once again delivered an attractive, high-quality building.”   

Een zakelijke vraag aan Wienerberger nv? Get in touch

Companies in this story

Keep following this

Get an email when a new story is published. No account needed.

What you follow
  • SubjectConstruction projects
  • CompanyWienerberger nv
Share this article

Follow Bouwen aan Vlaanderen

Follow

Follow a project or company and you’ll receive an email whenever a new story appears. Follow a theme or topic and you’ll receive a weekly roundup. No account or password needed: every email includes a link to what you follow.