Construction projects

Scheldekouter, Gentbrugge | Green and blue living on the edge of Ghent

Scheldekouter, Gentbrugge | Green and blue living on the edge of Ghent

Scheldekouter is a cluster of four new residential buildings in Gentbrugge. The project combines a central urban location, with Ghent city centre just a 15-minute cycle away, with a very green setting.

The facing façades are built in brick.

The 3.4-hectare residential park is not only close to the Scheldt, but also adjoins the 650-hectare Gentbrugse Meersen nature reserve, which is being developed into one of Ghent’s four main green spaces. “We certainly didn’t rush into designing and positioning the complex,” says architect Luc Declercq (EL-Architects). “This was preceded by lengthy discussions with the city authorities, among other things. We had to ensure the project worked in harmony not only with the green spaces and water features in the surrounding area, but also with the existing residential neighbourhood further away.”

“That is why we deliberately decided not to build a fifth building with assisted-living apartments, even though there was ample space on the site. Instead, we created extra natural space, although the swale we installed also serves a practical purpose: it buffers rainwater.” The residential buildings offer oblique views of the Scheldt. “Thanks to this orientation, residents of the existing neighbourhood also retain their views of the Scheldt,” the architect explains.

Scheldekouter adjoins the Gentbrugse Meersen nature reserve.

Customer support

With Scheldekouter, client Gaelens Bouwprojecten was not aiming for an exclusive character. The homes appeal to young households, seniors and people looking for a sound investment. “But it is a luxury project,” says Kirsten Dekoning, project manager at main contractor Antwerpse Bouwwerken. “We noticed this, among other things, in the wide range of individual choices for the layout and finish of each apartment. We worked closely with the client’s customer liaison on this.”

Dekoning, who was 27 at the time, had carried out the cost calculations that secured the project for Antwerpse Bouwwerken. “It was then my first assignment as project manager.” Alongside two site managers of the same age, she formed the youngest team at Antwerpse Bouwwerken. “With guidance from the project director and support from our construction methods department and a robust BIM workflow, we managed to complete the work ahead of the scheduled handover dates.”

Only a small part of the site is built on. The rest has been given a green design.

Precise site organisation

The size of the site made working at Scheldekouter comfortable. “That very scale meant that logistics had to be managed with great precision. We had only two tower cranes at our disposal, with no overlap in their reach. In addition, work was under way on all four buildings at the same time. Delivered materials had to be placed within reach of the right crane to avoid unnecessary traffic around the site. We achieved this by bringing all activities together in a single, comprehensive lean plan, looking two months ahead.”

The four buildings contain fourteen, fourteen, eighteen and nineteen apartments respectively, making 65 in total. “Buyers had to finalise the internal layout and, consequently, the location of the vents and light fittings at an early stage,” says Dekoning. “Both the ventilation ducts and the electrical cables were laid on the precast floor slabs and cast into the concrete floor plates during the shell construction phase. By casting in the cables for the light fittings too, we avoided having to drill into the floor plates later, which prevented damage to the ventilation ducts.”      

The four building volumes are almost identical, but the internal layouts vary.

Underground parking

The car park is located beneath two of the four buildings. “But it wasn’t needed to meet Ghent’s parking standard of 1.3 spaces per home. Ghent has since reduced that standard to just 0.5 spaces. By using less land, we were also able to increase the local infiltration of rainwater,” says the architect. With an E-level of 50, Scheldekouter is highly energy-efficient. “A gas-fired heat pump provides low-temperature heating. The communal areas are powered by electricity from solar panels.”

The facing façades are finished in brick. “A quintessentially Flemish building material,” says Declercq, explaining the choice. “Brick sizes are also flexible, making them easy to work with, and they weather attractively.”     

Question about this story? Ask your question

Keep following this

Get an email when a new story is published. No account needed.