Silver Tower, Brussels | Working with unrivalled views of the capital

The construction of the Silver Tower has set the trend for transforming the area around Brussels North Station into a dynamic urban district where living and working blend seamlessly.
The elegant office complex will house no fewer than 2,000 civil servants from the Brussels Regional Public Service and the Tax Administration. All in a beautiful, sustainable setting where comfort and alternative ways of working take centre stage.

With the Silver Tower, Ghelamco has added a true flagship project to its portfolio. Its bold architectural concept embodies the ‘city of tomorrow’. The tower is designed as an elliptical lens, 28 metres wide and 69 metres long. It is also wrapped in an almost entirely glazed curtain wall, built using a frame system. “This allows every workstation to benefit from an abundance of natural light,” explain Frederik Eerens and Jan Demaeseleer, project managers at Ghelamco. “Occupants also enjoy direct views of the surrounding area. Outside, sunlight falling on the façade creates a visual spectacle that changes every day. At 137 metres, the tower is also one of the tallest buildings in Brussels, and indeed in Belgium. As a result, the Silver Tower draws all eyes to itself and plays a prominent role in the skyline of our capital.”

Flexible and sustainable
The building’s distinctive character also appealed to the Brussels-Capital Region, which decided to lease the Silver Tower for 18 years and rename it the ‘Iris Tower’. “Sustainability was also a major factor in this decision,” says Jan Demaeseleer. “Thanks to its high level of compactness and exceptionally efficient cooling system, we can secure BREEAM Excellent certification. Another important reason why the Brussels-Capital Region chose our project is its flexible, future-proof fit-out. The fully glazed façade, the fact that there are only a few columns
along the façade, and the high degree of adaptability provide maximum spatial flexibility.”

Closed versus open
In addition to seven underground levels for car and moped parking, storage facilities and building services, the ‘Silver Tower’ comprises a ground floor with two mezzanines, topped by 32 storeys. Its façade, with reflective anodised fins that help reduce energy consumption, gives the volume a relatively ‘closed’ appearance. The ground floor is conceived as a transparent plinth, where V-shaped columns clad in aluminium alternate with large glazed sections. “As the building’s plinth also incorporates two mezzanines, it creates a generous sense of space that makes the building feel inviting,” says
Frederik Eerens. “In this way, the ‘Silver Tower’ connects with the outside world. The area around Sint-Lazarusplein will also undergo a significant upgrade in the coming months, thanks in part to the creation of a new square in front of the tower.”

Maximum use of prefabrication
The building was constructed on a tight site, surrounded by public spaces and railway lines. Combined with the very short construction period of just 20 months, this made maximum use of prefabricated elements essential. “The structure consists mainly of reinforced concrete elements,” explain the project managers. “This was the most cost-effective way to ensure the required fire safety and fire resistance within the specified construction period. The structure was assembled using
precast beams and columns, with hollow-core slabs and, where required, predalles to accommodate the elliptical shape of the floors.”
FDS: mobile acoustic partitions
The office building of tomorrow must be able to adapt flexibly to new needs and ways of working. That is why several large meeting rooms in the Silver Tower can be divided using mobile acoustic partitions. These solutions were purchased from Funktie en Decoratie Systems (FDS) in Drongen, a reputable player in this market segment for more than 45 years. “Our main strength is our broad product range,” says project manager Didier Degomme. “As well as mobile acoustic partitions, customers can also find folding and sanitary partitions and various types of interior and exterior solar shading. We also handle installation and servicing ourselves, ensuring quality and a long service life.” FDS installed no fewer than 26 partitions on various floors of the Silver Tower, all with exposed profiles and sound insulation of 52 dB. “All the panels are fire-retardant (M1) and finished with a white melamine layer,” says Didier Degomme. “The challenge on this project was keeping pace with Beddeleem, the company responsible for the entire interior fit-out. Careful planning and clear agreements were crucial to ensuring everything went smoothly. Having worked together on several occasions, we are now well attuned to one another. This enabled us to deliver a result in the Silver Tower that we can both be proud of.”
Interalu: climate ceilings
The spectacular views of the Brussels skyline are not the only thing that makes the Silver Tower such a pleasant place to work. The building’s all-round comfort also plays a vital role. The Silver Tower is fitted throughout with climate ceilings from Interalu. This 100% Belgian family business, based in Antwerp, is the market leader in climate ceilings. “We never rest on our laurels: we continue to strive for newer and better solutions,” says CEO Anthony Schrauwen. “For every project, whether new-build or renovation, we analyse the customer’s actual needs before selecting the most suitable solution. For the Silver Tower, we chose our energy-efficient ‘Easy-KlimaPlus’, which also guarantees excellent sound absorption. We adapted our climate ceilings to the interior of this office complex, allowing for a low installation depth and making the ceiling blend seamlessly into the overall design. As we handle the installation ourselves, we were able to guarantee a flawless aesthetic result. The outcome? A satisfied customer, and that makes us particularly proud.”
TECHNICAL SPECIFICATIONS
Client
Ghelamco Group (Ieper)
Architect
Atelier d’Architecture (Genval) & Accarain-Bouillot (Schaarbeek)
Question about this story? Ask your question
Wie aan Silver Tower werkte
- ClientGhelamco Group (Ieper)In this story
- ArchitectAtelier d’Architecture (Genval)In this story
- ArchitectAccarain-Bouillot (Schaarbeek)In this story
- mobiele akoestische wandenFunktie en Decoratie Systems (FDS) uit DrongenIn this story
- climate ceilingsInteraluIn this story
- interieur-afwerkingBeddeleemIn this story
- vetafscheider op maatKessel AGMentioned in Silver Tower, Brussels | Bespoke grease separator for a restaurant serving hundreds of staff
- vloerspecialistAtrio FlooringMentioned in Silver Tower, Brussels | Floor and wall finishes from A to Z
Keep following this
Get an email when a new story is published. No account needed.
- ProjectSilver Tower
- SubjectConstruction projects
- CompanyGhelamco Group (Ieper)
- CompanyAtelier d’Architecture (Genval)
- CompanyAccarain-Bouillot (Schaarbeek)
- CompanyFunktie en Decoratie Systems (FDS) uit Drongen
- CompanyInteralu