State-of-the-art production hall for architectural concrete

Leading company Stijlbeton, based at Schollebeekstraat 74 in Lier, is in the midst of an extensive expansion and renewal programme. A brand-new production hall was brought into operation early this year, and the equally new offices are due for completion in January 2023. The surrounding area is also now undergoing extensive redevelopment and improvement works. “Stijlbeton already had a production area measuring just over 3,000 m², and we have added a new, state-of-the-art 5,000 m² production hall,” says managing director Yves Maes.

The expansion of the production facilities also provided an opportunity to add new offices at the same time. The aim was to create a considerably more pleasant working environment for the many employees, although the main reason for the expansion was the need for additional production space. “After 25 years, the company was increasingly bursting at the seams, and a thorough renewal and expansion had become long overdue,” says Yves Maes. “Demand from the market continues to rise, while terraces for apartment buildings are becoming ever larger, making production optimisation essential. Thanks to the recent new build, we can now significantly increase our capacity, while also providing a much more pleasant workplace for our team.”

An aesthetic product
Stijlbeton is a well-known and experienced company with a particularly rich history, dating back to an old concrete pipe factory in Lier in the 1930s. Over the decades, Stijlbeton has grown into one of the leading players in Belgium’s bespoke architectural concrete market. Its products are mainly terraces for apartment buildings, but also include decorative columns and cornices for villas. “Alongside the production and supply of bespoke terraces for apartment buildings, which are the company’s core business, our production department also makes other custom concrete elements,” the managing director explains. “As well as the decorative columns and cornices for villas mentioned earlier, these include entrance canopies, window and door surrounds, canopies, bay windows and corner panels, decorative mouldings and much more.”
Whatever architectural concrete element a customer wants, Stijlbeton produces it in-house. “One of the many advantages of architectural concrete is that it is a highly aesthetic product,” says Maes. “In terms of appearance, it offers an enormous range of possibilities. If you prefer smooth, bright white concrete, we can do that. Or perhaps you would rather have the look of the well-known bluestone, white marble or another natural stone. That is no problem either. The possibilities and applications are virtually endless. To give another example, architectural concrete can also incorporate pieces of ground granite and marble, creating an entirely different look. Whatever you choose, we deliver all our products to any site in Belgium.”

A wide range of projects
Stijlbeton also takes on a very wide range of projects. “We carry out the studies and design work in-house,” says Yves Maes. “This can mean producing twenty identical, relatively simple terraces for an apartment building, or equally, detailed bespoke work for a single villa. From the smallest decorative pieces to the largest terraces, our new hall can produce elements and balconies weighing up to 20 tonnes.”
Another key strength of Stijlbeton is the service it provides. Yves Maes says: “We are always highly flexible and can respond quickly. Although we obviously do our best to avoid them, unforeseen circumstances can arise during a construction project. The customer is king, and we always do everything we can to resolve any difficulties as quickly as possible.”

No more juggling
Stijlbeton is rightly proud of its ability to produce virtually any shape in bespoke architectural decorative concrete, thanks in part to a unique process using plastic moulds. But this takes space. A lot of space. To meet this need, the company had to expand and build a new production hall. “In the past, it often took a bit of juggling to produce and deliver all our orders on time,” says Maes. “But the new hall has enabled us to increase our production capacity by as much as 50%, while also allowing existing formwork for larger sites to be stored without interruption and without disrupting the rest of production. Producing high-quality formwork is a time-consuming, labour-intensive task in its own right. Stijlbeton makes the formwork and reinforcement cages itself for every element the company produces.”
The old production hall, which has also undergone a major facelift, now houses the joinery shop and welding department, both of which have more space. All formwork is carried out in the new production hall, where elements of up to 4 m³ can be poured in a single phase. It also houses a new concrete batching plant, including covered storage for aggregates. The extra space also makes it possible to use larger, more powerful overhead travelling cranes with a lifting capacity of 20 tonnes, up from 12 tonnes previously.

Four clear objectives
“Saving time, increasing output, flexibility and better working conditions: these were the objectives when planning this prestigious project,” says Yves Maes. “That is also why we chose to build offices and staff facilities along one side of the new production hall.” The shared facilities, including changing rooms and a canteen, will be located on the ground and first floors, while around 400 m² of office space is being fitted out on the second floor. These spacious, modern offices are heated and cooled using geothermal energy and thermally activated concrete core systems. Both the office building and the production hall feature modern, elegant architecture, with impressive white architectural concrete columns. These were, of course, produced by Stijlbeton itself, showcasing the remarkable possibilities of bespoke work. Expansive glazed sections between the columns ensure an abundance of natural light in the offices.
Yves Maes says: “As mentioned earlier, our main focus internally was on expanding and renewing the production facilities, with improved, new infrastructure for administrative staff as an additional priority. We have also added a spacious showroom, where interested customers can view a small selection from our extensive range.”

A focus on sustainability and ecology
Stijlbeton’s management did everything possible to create the most pleasant working environment and organise the entire production process as efficiently, sustainably and ecologically as possible, with particular attention to heating and cooling, lighting, ventilation and more. In addition, 150,000-litre collection tanks enable extensive rainwater harvesting, with the water to be used as much as possible in the various production processes.
“The main challenge in this particular project was that part of the old production hall had to be moved into the new facility,” concludes Yves Maes. “We also had to ensure that production continued without interruption.” Stijlbeton rose to the challenge with flying colours. Working conditions are now even more pleasant and efficient than before …
Question about this story? Ask your question
Who worked on it
Kantoorgebouw Staalbeton
- bekleding luifelboorden en plafonds
Sign & Facade - clientStaalbeton
- main contractorGroep Van Roey
- architectSchellen Architecten
- stabiliteitsstudieStudiebureel SMB
- building servicesGebotec
- boringen voor thermische energieopslagBackx
- climate ceilingsInteralu
- zonwerende glazen lamellenGlaswerken Vanheertum
- dakisolatieThiers-Horizon
- handgevormde bakstenenPetersen
- clientStijlbeton NV
- architectwilma wastiau
- main contractorDe Pelsmaeker
Keep following this
Get an email when a new story is published. No account needed.
- ProjectKantoorgebouw Staalbeton
- SubjectConstruction projects
- CompanyStijlbeton NV
- Companywilma wastiau
- CompanyDe Pelsmaeker