Striking training centre reflects far-reaching business ambitions

A deep dive into the world of Unilin: that is ‘The Dive’ in a nutshell. This state-of-the-art information and training centre opened its doors in autumn 2022. The building and the revamped, eponymous vision for training and development take their name from the idea of delving deeper: immersing yourself in information, discovering and continuing to evolve.
‘The Dive’ is a figurative springboard for Unilin’s current and future employees. Using technology and a 3D experience wall, visitors are introduced to the world of Unilin Group and the opportunities this internationally renowned company offers in terms of jobs and careers. The striking design is by B2Ai architects.

Three storeys and a roof terrace
The building is located on Unilin’s site in Wielsbeke, on the former site of a caretaker’s house. The entrance, with a room for instructors and trainees behind it, faces the existing car park. The ground floor also houses two practical training rooms equipped with production machinery. The first floor includes two classrooms and a computer room. Between lessons, trainees can take a breather in a ‘breakout room’. At the fire brigade’s request, an additional escape route to an external staircase has been provided in classroom 2. The second floor houses office space for instructors and a plant room. Above, a roof terrace overlooks the nearby roundabout and the void above the break area. The logo of The Dive is displayed on a partition wall. The LED strip on the façade refers to the path or journey that new and current employees can take during their training and lifelong learning.

Blending into its surroundings
The building has a concrete structure clad with timber slats. This vertical articulation ties its architecture in with that of the existing office building opposite the visitors’ car park, where sun-shading panels also create a vertical rhythm. The timber slats refer to the ‘basic product’ at the heart of Unilin’s business, while also highlighting its sustainable approach. The training centre gives the site a new face when viewed from the roundabout and screens the industrial production halls behind it.

New and existing greenery
Between the public realm and the new building is an existing green space with trees, shrubs and a lawn. It has been supplemented with specimen trees, giving the site a refreshing, natural appearance. A 15,000-litre tank collects rainwater from the main roof for reuse in flushing the building’s toilets. The roof terrace and the remaining roof area used for water attenuation are connected to the existing attenuation and infiltration pipe serving the demolished caretaker’s building.
Question about this story? Ask your question
Who worked on it
The Dive in Wielsbeke
- ClientUnilin
- ArchitectB2Ai architects
- Main contractorVan de Walle Industrial Building Contractor
Keep following this
Get an email when a new story is published. No account needed.
- ProjectThe Dive
- SubjectConstruction projects
- CompanyUnilin
- CompanyB2Ai architects
- CompanyVan de Walle Industrial Building Contractor


















