Construction projects

Sustainable renovation delivers on sky-high ambitions

The First werd opgeleverd in januari.
The First werd opgeleverd in januari.

With its superb location on Frère-Orbansquare, in the heart of Brussels’ European Quarter, The First is a one-of-a-kind project. It involved the renovation and repurposing of a dilapidated office building dating from the 1960s, which had previously housed the Council of State. The complex now has a mixed-use programme and boasts a BREEAM Excellent certificate, thanks to a strong focus on carbon neutrality and biodiversity. To deliver on the client’s sky-high ambitions, the architects had to innovate and push boundaries in all manner of ways. 

The fixing system is designed to make the PV panels easy to replace.

Client Eaglestone set the bar high for this project. Working with assar architects, it met every target, which is quite unusual. The 9,000 m² building, spread over eight storeys following a striking two-storey extension, was handed over in January. The main occupier is currently busy fitting out the interior.

Refurbished ground floor and additional storeys

Julien Vanopdenbosch, partner architect at assar architects: “The building that preceded The First was fairly conventional and occupied a prime location, but it was completely run down and no longer met modern requirements for layout, energy efficiency and environmental performance. Eaglestone identified the many technical and construction challenges and secured the funding to make something exceptional of it. There was certainly no shortage of ambition, particularly when it came to reducing the project’s environmental impact.”

As the rear façades have an ideal orientation, they too are fitted with PV panels, continuing the design of the roof.

The building’s concrete structure was still in good condition and offered the clear heights needed to meet current expectations. In keeping with the project’s circularity goals, it was therefore retained and reused. 

The building had the major drawback of being completely cut off from the public realm. One of the main priorities was therefore to reconnect it with the surrounding urban fabric by completely refurbishing the ground floor and giving it a public function. A second challenge was to equip the building with an extension that was both functional and aesthetically pleasing. Julien Vanopdenbosch: “At assar, we attach great importance to the roof, which is often visible in Brussels because of the height of its buildings. That is why we created a new, two-storey volume with a lightweight structure, including a distinctive roof that connects seamlessly with the neighbouring rooflines. We also wanted to orient the windows towards the city and create expansive views. As a roof like this is exposed to the sun, it is fully fitted with PV panels.”

Seeing the city while being seen by it: a delicate balance.

Keeping ambitions on track

As the rear façades have an ideal orientation, they too are fitted with PV panels, continuing the design of the roof. Julien Vanopdenbosch: “We carried out an R&D phase to fine-tune these panels, working with the manufacturer on their appearance and dot pattern to achieve the desired shade while taking energy performance into account. We also designed the fixing system so that the panels can be replaced easily, for example to accommodate further technological developments.”

Making the most of what already exists means using the opportunities available. For example, some of the heat is supplied by the Verizon data centre already located in the building. The engineers found the right mix of PV technology, heat recovery and heat pumps to provide a coherent solution. Materials were selected based on their provenance, as local as possible, their durability and their recyclability. Even the outdoor terrace was built using reclaimed natural stone elements from another site.

The roof garden also acts as a rainwater retention area.

The urgent need for more greenery in the city, even in small spaces, was not overlooked. The roof garden also acts as a rainwater retention area. The rainwater tanks are located on level +1 so they can operate by gravity. Biodiversity was encouraged by installing nesting boxes for bats and swifts.

A rewarding end to a demanding project

Asbestos removal from the building took longer than expected, while the presence of the data centre meant that precautions were needed to protect it from vibrations and dust. “The site was also affected by the consequences of COVID-19, soaring material prices and even shortages of certain materials,” says Riccardo Masia, the architect responsible for site supervision at assar. “It required a great deal of coordination, but the good cooperation between all the parties involved has led to a result we can only admire today.”

One of the main challenges was to equip the building with an extension that was both functional and aesthetically pleasing.

It is one thing, of course, to construct a new building in line with BREEAM Excellent standards, but renovation is much more complex in that respect. Unforeseen circumstances emerged during construction that had not been identified in the theoretical studies, threatening to force a departure from the original ambitions. Julien Vanopdenbosch: “What makes this project so special, however, is that we did not let that discourage us. It has to be said that we had strong support from the client, and contractor Valens was not thrown off course either. For them, too, this project is a real success story.”    

A business enquiry for Assar Architecten? Get in touch

Who worked on it

  1. ClientEaglestone (Brussel)
  2. Architectassar architects (Brussel, Antwerpen, Luik, Luxemburg, Parijs)
  3. Main contractor(s)Valens (Brussel)
  4. Also involvedAssar Architecten

Keep following this

Get an email when a new story is published. No account needed.

What you follow
  • SubjectConstruction projects
  • CompanyAssar Architecten
Share this article

Follow Bouwen aan Vlaanderen

Follow

Follow a project or company and you’ll receive an email whenever a new story appears. Follow a theme or topic and you’ll receive a weekly roundup. No account or password needed: every email includes a link to what you follow.