Design and build teams are gaining popularity, particularly on public projects. The city council of Ronse also chose this approach to deliver the new swimming pool. The result is a sporting and leisure attraction that ‘strikes a chord’. With the motto ‘seeing people exercise inspires you to exercise’, openness is central, both literally and figuratively.
The new swimming pool is (for now) the final phase of an ambitious project to get the people of Ronse involved in sport. In 2016, sports hall ‘t Rosco was built on a vacant site at the boundary between the urban and green areas, along with sports fields, a Finnish running track, a large car park and a landscaped entrance area. The intention was to complete the site with a large swimming pool, which has now been achieved. “It is a rectangular volume with one to two storeys and a usable floor area of almost 3,800 m²,” says Kevin D’Hondt of B2Ai, which was responsible for the design and site supervision together with VenhoevenCS. “Because the existing sports hall is inward-looking, we wanted the swimming pool to face outwards. It literally opens up towards the outdoor sports fields, resulting in a highly inviting character and perfect integration into its surroundings.”

The 20.5 x 25-metre sports pool has a movable bulkhead
and floor.
Progressive swimming pool
The new swimming pool is a standalone complex, separate from the existing sports facilities but functionally connected by a glazed link building housing the entrance and an extension to the existing cafeteria. Kevin D’Hondt: “This connecting space is designed as a patio, with direct views of the swimming pool and the green surroundings beyond. The leisure area includes a baby pool, toddler pool and children’s pool, a family slide and a 50-metre interactive tube slide with music and light effects. Naturally, there is also the 20.5 x 25-metre sports pool, which has a movable bulkhead and floor. This allows it to be divided lengthways into two separate pools, for example an instruction pool 90 cm deep and a full-depth training pool, 2 metres deep.”

The swimming pool literally opens up towards the outdoor sports fields, resulting in a highly inviting character and perfect integration into its surroundings.
Spectacular canopy roof
The distinctive canopy roof, beneath which all the swimming pool facilities are grouped, is a fine example of the added value a design and build team can deliver. “By developing the concept together with the architects, we succeeded in creating a spectacular building,” says Rudy De Cock, technical director at main contractor Pellikaan. “The roof consists of an orthogonal grid of glued laminated timber beams. Each cell in this regular beam grid measures 1m75 x 1m75 and, as well as serving a structural purpose, brings organisational order to the open-plan layout: all the rooms, rooflights and box-like volumes are aligned with the roof dimensions.” Architect Kevin D’Hondt adds: “This structure also creates a fine balance between the generous, open layout of the swimming pool on the one hand and the enclosed nature of the existing sports hall on the other. It is a clear design structure that gives users a high degree of transparency.”

The floating roof consists of an orthogonal grid of glued laminated
timber beams.
Environmentally friendly swimming pool
The swimming pool in Ronse is also among the top performers when it comes to the environment. The design maximises daylight, partly through the alternation of open and closed sections of the façade, the patio and the use of rooflights in the private areas. Solar energy is used to the greatest possible extent, both to generate electricity (PV system) and to heat domestic hot water (solar thermal collectors). Rudy De Cock: “This meant that just one additional boiler was needed alongside the two serving the sports hall. Rainwater is also collected, stored and used for the sanitary installations and as make-up water for the pool. The use of UF/RO (ultrafiltration/reverse osmosis) provides additional purification of the filter backwash water and allows it to be reused to the greatest possible extent, reducing the wastewater fraction to an absolute minimum.”

The complex includes a leisure area with a baby pool, toddler pool and children’s pool, a family slide and a 50-metre interactive tube slide with music and light effects.
Innovative approach
Despite the complexity and the many technical systems, Pellikaan completed the works in just nineteen months. “On the one hand, this was down to the thorough preparation that is inherent in working with a design and build team,” explains Rudy De Cock. “On the other, we divided the project into two work areas. This allowed us to work on
the swimming pool and the facilities simultaneously. Each zone was built separately, with its own tower crane. The strategy paid off: the project was fully completed, commissioned and handed over by the stipulated deadline.”

The connecting space is designed as a patio, with direct views of the swimming pool and the green surroundings beyond.
Stronger together
It goes without saying that this way of working had implications for the construction. For example, a secant pile wall was installed to separate the two work fronts (and the plant basement). “The biggest challenge was undoubtedly installing the complex 3D timber roof structure in combination with the two colossal concrete
beams,” says Rudy De Cock. “Thanks to extensive prefabrication and thorough preparation using 3D models, everything went smoothly. The good rapport and constructive collaboration between the architects, engineering consultants and subcontractors made the swimming pool in Ronse a success for all parties. It is an exceptionally fine structure of which everyone can rightly be proud.”
Question about this story? Ask your question