The new community centre in Koolskamp recently opened its doors. The architects faced the considerable challenge of designing a building that could accommodate different functions and users, while respecting its surroundings and prioritising sustainability.  

The community centre is characterised by bespoke solutions and a wide variety of finishing details.

The new community centre was built on the site of the old municipal school, which closed in 2007. The school was badly outdated and no longer met modern standards. It was demolished and replaced by a new building, which will provide accommodation for four associations: Judoclub Koolskamp, Harmonie Sint-Cecilia Koolskamp, out-of-school childcare centre ’t Filoetje and Sint-Maartenshuis. The building behind the school, which currently houses the brass band, the art society, the KLJ and the Chiro, will be retained.

The playful character and warmth of the exterior continue inside.

Creative spaces 

The new community centre has a floor area of 1,147 m² across two storeys. Each association has its own space, tailored to its specific needs and activities. The judo club has a spacious training hall with changing rooms and a cafeteria; the brass band has a room with good acoustics and a bar; the childcare centre has a reception area, a dining room, a kitchen, and various play and quiet zones; and Sint-Maartenshuis has a room for distributing food and clothing. 

“The building has been designed so that the entrances for the three associations are entirely separate from that of the childcare centre,” says architect Kasper Verfaillie. “The sanitary facilities are separate, too. The courtyard has been designed as an outdoor play area for the childcare centre, with soft-surfaced play areas, a sandpit and several raised wooden platforms … When the childcare centre is closed, the courtyard can also be used as a playground or terrace by the other associations. This could include all kinds of outdoor activities, such as games, performances and receptions. It also connects the different associations, giving them a place to meet and exchange ideas.”

An additional mezzanine level has been incorporated into the childcare centre, overlooking the play area.

A harmony of timber, metal and concrete

“When designing the community centre, we paid close attention to architectural quality, integration with the surroundings and sustainability,” Kasper Verfaillie continues. “We opted for clean, restrained lines that contrast with the existing buildings while also engaging with them. 

We also reflected the four entities in the design of the four pitched roofs, making their playful character clearly visible. We used durable materials such as timber, metal and concrete, giving the building its own character and a warm appearance. We also took insulation, ventilation, heating and lighting into account to limit energy consumption and CO2 emissions.”

The reception desk features numerous arches and curves, as well as a variety of finishes.

From outside to in

Kasper Verfaillie: “We carried the playful character and warmth of the exterior through to the interior. Here, too, we used two clearly defined materials, with the ‘warm’ material, in this case Clicwall system panels, reaching a height of 2.70 metres. This is the same height at which the warm materials begin on the external wall. We added a mezzanine level to the childcare centre, overlooking the play area. This ‘lookout post’ is essentially a large circular opening almost 3 metres across, with a blue net woven into it.”         

The interior also features two clearly defined materials, with the ‘warm’ material, in this case Clicwall system panels, reaching a height of 2.70 metres.

Question about this story? Ask your question

Who worked on it

Gemeenschapscentrum Koolskamp in Ardooie

  1. ClientGemeente Ardooie
  2. ArchitectArchitectenbureau Verfaillie-Boucquet
  3. Main contractorAPK Construct
  4. schrijnwerk voor ramen en deurenNew Driessens

Keep following this

Get an email when a new story is published. No account needed.

What you follow
  • ProjectGemeenschapscentrum Koolskamp
  • SubjectConstruction projects
  • CompanyGemeente Ardooie
  • CompanyArchitectenbureau Verfaillie-Boucquet
  • CompanyAPK Construct
  • CompanyNew Driessens
Share this article

Advertisement

Follow Bouwen aan Vlaanderen

Follow

Follow a project or company and you’ll receive an email whenever a new story appears. Follow a theme or topic and you’ll receive a weekly roundup. No account or password needed: every email includes a link to what you follow.