Urban shopping centre brought back to life

Shopping centre Het Pand in the centre of Waregem has undergone a complete renovation. It was a challenging project that was brought to a successful conclusion. Flexibility and expertise were essential, both logistically and technically.
Shopping centre Het Pand is owned by the city of Waregem, so contractor Artes Depret was appointed through a public tender. “We achieved the highest score in the procedure,” says project manager Kathy Geiregat. “Price is of course an important criterion, but other factors are increasingly being taken into account too. Our proposed approach probably made the difference. We’re ‘constructive people’, as our tagline puts it. When it comes to challenging projects, we’re the people to call. We work constructively with clients to find the best way to deliver them.”

The work at the shopping centre proved particularly challenging from a logistical point of view. “It wasn’t a project every contractor would have been willing to take on. First of all, the site was quite extensive. In addition, only a limited number of plans of the existing buildings were available. The deadline was also very tight. Most of the shopkeepers had to move to temporary alternative premises during the works, which put even more pressure on us to complete the renovated shopping centre as quickly as possible. The city also wanted to open Het Pand just before Waregem Koerse, so there was very little room for manoeuvre.”

Flexibility essential
Artes had to be highly flexible throughout the works. “There were a lot of changes to the plans and designs along the way. Not all the businesses that would be moving into the new Pand had been identified when work began. Whenever a new retailer signed up, they were still able to tell us what they wanted from their unit.”

The works themselves also presented a number of technical challenges. “Part of Het Pand comprises office buildings, which were retained. Creating a new monumental passageway in a building where people continue to work is no easy feat. The passageway had to be supported so that it could bear the structure above it. The external joinery and ceilings on the upper floor were also renewed while the offices remained in use. In another part of Het Pand, shops stayed open during the works. We used dust screens to minimise disruption as much as possible. Casting the large staircase in situ in the middle of the existing complex was a great
challenge for our workers, and one we’re incredibly proud of.”

References
At Artes, they are delighted to add the project to their list of references. “Het Pand is well known in the region, so it’s great to have our name associated with it. It was also simply a rewarding project to work on, given all the logistical and technical challenges. Some areas were inaccessible to tower cranes, and we had to carefully assess the use of machinery in advance, given the load-bearing capacity of the basement. Deliveries also became increasingly difficult because of Devagro’s new car park. Good preparation and open communication were therefore crucial. Fortunately, our collaboration with the architect, the engineering consultancy and the city authorities was excellent throughout.”

Industry professionals walking around Het Pand will notice a few striking features. “Movable louvred roofs were installed so visitors can walk around the covered shopping centre in rainy weather. I also really like the façade panels at the entrances: they are made from bronze-coloured aluminium composite cassettes.”
Een zakelijke vraag aan Orona NV/SA? Get in touch
Who worked on it
- ClientStad Waregem
- ArchitectArchitectenbureau Bart Dehaene (Gent)
- Main contractor(s)Artes Depret (Brugge)
- Also involved
Orona NV/SA - Also involved
SAPA
Keep following this
Get an email when a new story is published. No account needed.
- SubjectConstruction projects
- CompanyOrona NV/SA
- CompanySAPA