Worn-out office building transformed into an attractive residential development

For half a century, the office building on Antwerp’s Rijnpoortvest had a bulky appearance due to its broad, horizontally oriented form. This did not sit well with the architecture of the Leien and Tunnelplaats, which feature considerable variation in façade widths and cornice heights. It was therefore an obvious choice to carry these characteristics through into the new residential development, creating a more elegant building.
Subtly dividing the building’s volume helps it fit better into its surroundings. The corner section was raised slightly, while the two lower volumes echo the scale of the adjoining town houses. The innovative structural system for the 1970s, comprising central columns, load-bearing façade cassettes and thin concrete floor slabs with post-tensioned reinforcement, was retained in its entirety. Bavo Thiré and Farah De Schutter of architecture firm Stramien explain: “That was also the main challenge with this particular project. Post-tensioned reinforcement is a system that does not allow openings to be made in floors, because of the risk of damaging or drilling through the tension cables. As a result, finding ways to incorporate shafts, lifts, ducts, openings and so on was a nerve-racking process every time.”

Slenderer and more vertical
The low plinth was visually raised to above the first floor, giving the building a much more slender appearance. The old façade was completely replaced, but its pattern remains a defining feature. The interplay of horizontal parapets and vertical lines creates a more urban, vertically oriented architectural expression. The staggered volumes created side façades that make better use of the south-west orientation. Spacious roof terraces have been created on the uppermost roofs, while the roof above the car park has been enhanced with a large communal roof garden.
The different volumes are also distinguished by variations in colour and texture: white and beige exposed concrete alternate with brickwork in the same colours. Pilasters, lintels and cornices add refinement to the façade composition.

“Our role as architects was to convert the offices into homes and add three storeys on top of the existing structure,” says Farah De Schutter. “We were responsible for preparing the design, tender documents and construction documents, as well as overseeing the works. During the design process, we held regular consultations with various departments of the City of Antwerp and the aesthetics committee, while during the construction phase, weekly meetings were held with all the parties involved.”

A strong focus on sustainability
Retaining the existing structure was a key priority for several reasons, including sustainability. “By not demolishing it, we avoided removing the rubble in more than a thousand lorry loads,” explains Farah De Schutter. “Conversely, there was no need to bring in an equivalent quantity of concrete. In total, we kept at least two thousand lorries out of the city. We also avoided emissions equivalent to the annual CO2 output of around a thousand households.”
The choices made for the building’s new layout will also make a similar renovation much easier in twenty or thirty years’ time. The works have resulted in a more flexible floor plan, and lightweight materials were used for the new fit-out. This will keep the environmental impact of a future conversion to a minimum. “I think we can all be pleased with how successfully we have transformed
a drab office building with low ceilings into a fresh residential development with real presence,” concludes a satisfied Farah De Schutter.

Een zakelijke vraag aan Orona NV/SA? Get in touch
Who worked on it
- ClientFides Invest (Antwerpen)
- ArchitectStramien (Antwerpen)
- Main contractor(s)Democo (Hasselt)
- Also involved
Orona NV/SA
Keep following this
Get an email when a new story is published. No account needed.
- SubjectConstruction projects
- CompanyOrona NV/SA