General

Construction of Europe’s first multi-storage facility for vehicles officially gets under way

Construction of Europe’s first multi-storage facility for vehicles officially gets under way

ICO delivers a European first in Zeebrugge

New standard for vehicle logistics

The multi-storage facility will occupy a site of just under 2.5 hectares and accommodate 10,120 vehicles. This expansion will enable ICO to increase its annual throughput capacity from 2.5 million to 3 million vehicles. The project is due for completion by the end of 2027.

What makes the project exceptional is its extensive automation. Ten fully automated cranes will store and retrieve vehicles without manual intervention. The system will be housed in two separate buildings, with a distributed crane structure specially designed with fire safety and access for emergency services in mind.

Technology as a lever for efficiency and sustainability

Vehicles are automatically identified using VIN recognition and stored in the correct location. The entire system will be integrated with ICO’s existing Terminal Operating System (TOS), allowing all movements to be monitored in real time.

The new storage solution is not only efficient but also sustainable. By storing vehicles more compactly and significantly reducing and automating internal movements, energy consumption and emissions will fall. The area required is more than 10 times smaller than that needed for traditional storage in an open compound. This makes the project part of ICO’s and the Port of Antwerp-Bruges’ wider sustainability ambitions.

Importance for the port and region

According to Alain Guillemyn, Managing Director of ICO, the project is about more than infrastructure. “This is an important moment for our company and for the port. With this project, we are showing that Zeebrugge is a place where innovation can be delivered on a large scale. We are investing not only in capacity, but also in technology that will prepare our sector for the future.”

The multi-storage facility will make Zeebrugge more attractive to international car manufacturers and logistics operators, and reaffirm the port’s position as a crucial link in the European automotive supply chain.

Strong collaboration between Belgian partners

The project is being delivered through close collaboration between specialised Belgian partners. As main contractor, Alheembouw is coordinating the entire construction programme and ensuring the efficient, high-quality delivery of this complex project. Stow Group is responsible for the entire steel structure of the high-rise building, including the innovative racking system in which the vehicles will be stored. Ceratec is responsible for automating this racking system, enabling vehicles to be moved in and out entirely automatically. Architect Stranger AE and engineering consultancy BM Engineering Group designed the architecture, structural stability and building services.

When the facility becomes operational at the end of 2027, Zeebrugge will have a unique logistics infrastructure that significantly raises the bar for vehicle storage and handling in Europe.

Question about this story? Ask your question

Who worked on it

Multi-storage ICO Zeebrugge in Brugge

  1. main contractorAlheembouw
  2. de volledige staalconstructieStow Group
  3. automatisering van dit racksysteemCeratec
  4. architectStranger AE
  5. engineering consultancyBM Engineering Group

Keep following this

Get an email when a new story is published. No account needed.

What you follow
  • ProjectMulti-storage ICO Zeebrugge
  • SubjectGeneral
  • CompanyAlheembouw
  • CompanyStow Group
  • CompanyCeratec
  • CompanyStranger AE
  • CompanyBM Engineering Group
Share this article

Follow Bouwen aan Vlaanderen

Follow

Follow a project or company and you’ll receive an email whenever a new story appears. Follow a theme or topic and you’ll receive a weekly roundup. No account or password needed: every email includes a link to what you follow.