Monumental renovation calls for creative thinking and calculations

Renovation work on a historic monument requires in-depth expertise in structural engineering and building services. All the more so when the project also involves integrating a new building, as at Sint-Baafskathedraal.
With SDKE of Bruges, the client brought on board a partner with a wealth of experience. And with good reason: even the most complex challenges were expertly resolved.

SDKE is the umbrella name for three organisations, each a specialist in its field: Studieburo De Klerck, De Klerck Engineering and Studiebureau Riessauw. “Between us, we now have around 45 employees with expertise across a wide range of fields,” says assistant manager Filip Warnier. “Clients can turn to us for structural and stability studies, building services, EPB and ventilation reporting, energy management, auditing and commissioning. Although our services are used mainly by care institutions and schools, we have also built up considerable expertise in monuments. As structural engineering consultants, for example, we helped restore the ‘Staten van Vlaanderen’ in Ghent City Hall and the bell tower of Sint-Baafskathedraal. Being appointed to work on the next renovation phase of this famous monument is a fine testament to the difference we can make in buildings of this kind too.”
A study process fraught with obstacles
The second renovation phase called for extensive thought and calculations. One particularly challenging element was the concrete basement in the inner corner between the cathedral and the chapter house. “It was deeper than the cathedral’s original foundation level and lay below the groundwater table,” says Patrick De Rycke, structural project manager. “Installing the service pipes between this basement and the other parts of the building was no easy task either, as some had to pass right through the wide cathedral foundations.” Frederik Decoutere, building services project manager, adds: “The discreet integration of modern building services was another major challenge. The crypt and side chapels in particular called for creative thinking, as they needed climate control, electrical supplies and data infrastructure. Despite everything, the result speaks for itself. Or rather, it is almost invisible, yet fully functional.”
Question about this story? Ask your question
Who worked on St Bavo's Cathedral
- renovatie glas-in-loodramenGlaskunst Atrium RestauratieMentioned in A unique upgrade of cultural heritage
- engineering consultancySDKEIn this story
Keep following this
Get an email when a new story is published. No account needed.
- ProjectSint-Baafskathedraal
- SubjectGeneral
- CompanySDKE