The former RIZIV headquarters on Montgomery Square in Brussels, an architectural icon from the seventies, embarked on a second life last year. A major renovation transformed it into Montgomery Parc, a two-part office complex with an extensive private park in the inner courtyard. The strong focus on wellbeing and sustainability was also reflected in the choice of lifts. These were expertly supplied and installed by Orona, which pulled out all the stops to complete the job on time and to a high standard.
Montgomery Parc is a development by Kolmont, based on a forward-thinking design by B2Ai. The complex comprises 22,000 m² of office space, supplemented by 930 m² of archive space, a 1,000 m² sports centre, three commercial units, a childcare centre, 263 bicycle parking spaces and 237 car parking spaces and, last but not least, a 5,000 m² private park. The project stands out not only for its scale, but also for its ambitious sustainability and wellbeing goals. Montgomery Parc is the first Belgian office project to achieve the highest ratings in three internationally recognised sustainability certification schemes: BREEAM (Outstanding), WELL (Platinum) and DGNB (Platinum). In addition, the buildings are fully CO2-neutral, and every effort has been made to retain and reuse existing structures and materials, including natural stone, façade cladding and façade louvres.

A blend of performance and user comfort
Orona also played its part in delivering this impressive office complex. The Belgian arm of the Spanish-Basque multinational, which recently moved into the tallest tower at The Edge in Waregem, installed a total of thirteen lifts from its Smart and Smart+ ranges, product lines frequently used in large-scale office projects. “Most of the lifts serve eight to eleven floors, alongside a smaller lift serving three floors. Their capacities range from 630 to 1,600 kilograms, accommodating between eight and twenty-one people. The project therefore includes both conventional passenger lifts and larger lifts capable of carrying heavier loads. Five lifts travel at 1 metre per second, while the other eight reach speeds of up to 1.6 metres per second,” explains Pieter Slegers, Sales Manager New Installations & Replacements at Orona. “Another important feature is destination control in several lift groups. Users indicate their destination floor on a display in advance, after which a specific lift is assigned automatically. This not only improves user comfort, but also optimises traffic flows in a large office building such as Montgomery Parc.”

A focus on sustainability and seamless integration
It is no surprise that sustainability was a key consideration in selecting the lifts. “All the lifts are fitted with energy recovery systems and a BlueKit ventilation flap. We also provided the necessary energy studies, traffic analyses and certificates for the BREEAM process,” explains Pieter Slegers. “The lifts also reflect the project’s high-end character in aesthetic terms. The lift cars are finished with HPL panels in a warm wood-effect finish, while the external finishes were integrated into the overall interior concept under Kolmont’s direction. The lifts are also connected to the building management system, offering further opportunities for monitoring and optimisation. For example, if a lift breaks down, its exact location can be identified immediately. The system also enables further traffic analyses and adjustments,” says Pieter Slegers.

An intensive process
Montgomery Parc was a distinctive project for Orona in several respects. It did not follow a conventional course: as this was a major renovation, technical issues had to be resolved throughout the construction phase. “That is why we worked very closely with main contractor Cordeel. Some of the lift shafts were already partly in place, but parts of them also had to be demolished. We advised on which elements could be retained and which could not. In addition, we were still developing the project when we had to start work on site and get our resources there quickly, followed by a series of changes, such as doors being moved to the opposite side. We also kept the lifts temporarily in service during the construction phase, which presented another challenge for our service department. In short, some aspects were unusual for a project of this scale, but ultimately that was no obstacle. We gave it our all to bring this challenging project to a successful conclusion, and we did!”