Healthcare projects

Wiegelied | Ostend

Wiegelied | Ostend

Eco-friendly childcare centre delivered in record time

A modern childcare centre featuring sustainable, renewable materials and exposed building services in a natural setting. Built in just nine months. There is no doubt about it: Wiegelied is an impressive feat of construction, made possible by excellent collaboration between the architect and the contractor.

Wiegelied

Ecology was clearly a key consideration in the design and construction of the Wiegelied childcare centre. Hempcrete and straw help create a healthy indoor climate thanks to their breathable, moisture-regulating and highly insulating properties. The most eco-friendly option was also chosen for the other finishing materials, including a rubber floor and TPO roof waterproofing. Architect Maarten Van der Linden (BAST architects & engineers) and Furnibo project manager Karel Lambert considered these choices together.

A creative approach to the brief
Ostend City Council and Farys, which launched the preceding Design & Build competition, required a multifunctional space, among other things. To meet the requirements within the specified budget and tight schedule, the architect took a creative approach. “The building has a wide central corridor that can be used as a multifunctional space when needed. The activity rooms are arranged around this central corridor, with one care room shared between every two rooms. This allows us to make optimal use of the available floor area,” says Maarten Van der Linden. “All the spaces used by the children are on the ground floor and visible from reception. The staff areas are located upstairs.”

Wiegelied

Choosing renewable materials
BAST consciously focuses on social and ecological projects. “At Wiegelied, we used renewable materials such as straw, clay and timber wherever possible. They give the building a unique character, but above all, they are healthy and sustainable.” For contractor Furnibo, the use of these specific materials provided an opportunity to push boundaries. Karel Lambert says: “It was the first time we had undertaken a timber frame build, and we did so using non-traditional materials. It was a challenge, but also an opportunity to learn. Even though we work with experienced subcontractors, we always need to understand the technical aspects of the work ourselves. One important question was how to achieve the required airtightness class using these natural materials. I can say with some pride that we succeeded.”

Construction team at work
The architect and contractor formed a construction team from the very first design stage. This helped them meet the tight schedule and brought several other practical benefits. “For instance, 90% of the timber roof beams have been left exposed. The building services obviously had to be integrated neatly, as they could not be concealed. Our construction team took these factors into account from the outset of the design, with a great result.”   

Words Stephanie Demasure    |    Photography Furnibo

TECHNICAL SPECIFICATIONS

Client
Ostend City Council

Architect
BAST architects & engineers (Ghent)

Main contractor(s)
Furnibo (Veurne) in collaboration with PUUR Bouwen (Baaigem)

Project partners share their insights

Holvoet Gebroeders | Interior joinery
In keeping with the sustainable building project's philosophy, Rubberwood, one of the most eco-friendly timber species, was chosen for the interior joinery at Wiegelied. Rubberwood comes from the rubber tree and is effectively a by-product. It is only processed once the tree has completed its latex-producing cycle. “Rubberwood has an attractive, light colour and is easy to work with. It goes perfectly with the exposed glulam beams,” says Dieter Vandeweghe of Holvoet Gebroeders. To preserve the timber's natural appearance as much as possible, it was treated only with a monocoat oil. Holvoet Gebroeders manufactured and installed all the interior joinery: solid window and door units, serving hatches, staircases, internal doors and more. Particular attention was paid to child safety, with features such as non-standard door handles and finger guards on the hinge and lock sides. “Our experienced team of twenty employees strongly believes in craftsmanship and quality. We stand out for our proactive approach and our specialisation in technically demanding finishes,” concludes Dieter Vandewege.

Question about this story? Ask your question

Wie aan Wiegelied werkte

  1. ClientStad OostendeIn this story
  2. architectBAST architects & engineersIn this story
  3. main contractorFurniboIn this story
  4. main contractorPUUR BouwenIn this story
  5. Houten binnenschrijnwerkHolvoet GebroedersIn this story

Keep following this

Get an email when a new story is published. No account needed.

What you follow
  • ProjectWiegelied
  • SubjectHealthcare projects
  • CompanyStad Oostende
  • CompanyBAST architects & engineers
  • CompanyFurnibo
  • CompanyPUUR Bouwen
  • CompanyHolvoet Gebroeders