Precast concrete louvre structure: a subtle focal point for a high-end adaptive reuse project
Text FEBEImage Verhelst Bouwmaterialen

After decades of vacancy, the Weylerkazerne in the historic heart of Bruges has been given a well-deserved new future. The protected site of the former seventeenth-century monastery has undergone a major transformation. A new residential volume has been added above the existing floors, concealed behind a precast concrete louvre structure.
The former Theresianenklooster has been listed as a protected monument since 2004 because of its rich architectural and historical value, dating back to the seventeenth century. In 2015, VDD Project Development acquired the site and decided to purchase the four adjoining properties on Ezelstraat as well. By demolishing most of these, it was possible to create an additional green courtyard and give the southern wing of the monastery a new lease of life.
A mixed-use project
In addition to the adaptive reuse of the former monastery, the project includes a new entity on Ezelstraat, partly renovated and partly new-build, and a new volume in the inner courtyard. By sustainably transforming the ageing site into a vibrant urban district, the project acts as a catalyst for the wider area.
A key consideration in the adaptive reuse was the upper storeys of the historic monastery. “The monastery originally consisted of two storeys plus a roof,” says Olivier Salens of Salens Architecten. “But the roof was demolished in the 1960s and replaced with an additional volume. The building-history analysis concluded that this extra storey dated from the monastery’s military period and needed to be replaced.”
A harmonious whole
A new two-storey volume offering contemporary residential comfort was therefore added above the historic floors of the original monastery. The new upper structure is characterised by contemporary architecture with a strong identity, in which old and new enhance one another. The apartments are subtly concealed behind a precast concrete louvre structure, reinterpreting the rhythm of the monastery cloisters.

Olivier Salens: “The military period is also part of the building’s rich history. With that in mind, we sought to reconcile the monastery and the barracks. When designing the upper structure, however, the focus was firmly on preserving the atmosphere of the monastery. The upper structure had to remain subordinate to the lower one, while still forming a harmonious whole with it. We deliberately avoided a black aluminium or timber box, opting instead for concrete in a colour that closely matches the limewashed lower structure.”
Acid-etched finish
The new upper structure on the historic monastery, the new-build and renovation work on Ezelstraat, and the new volume in the inner courtyard are all characterised by a striking precast concrete louvre structure. “For this project, we produced beams and columns,” says Patrick Decorte of Verhelst Bouwmaterialen. “There are around 130 columns in total, used as louvres not only for the new upper structure, but also for the two other parts of the project, on Ezelstraat and in the inner courtyard.”
Finding the right concrete mix took considerable time. Patrick Decorte: “The colour was particularly important. The columns needed to be in keeping with the limewashed façades. After making a mock-up and numerous samples, we eventually arrived at the desired shade of beige. As for the finish, both the terraces and the columns were acid-etched.”
A pleasing rhythm
The new upper structure of the historic monastery creates a pleasing rhythm, which was also reflected in the production process. “The high degree of repetition was, of course, a dream for us from a production perspective,” says Patrick Decorte. “Almost all the columns had the same height and cross-section, allowing us to make optimal use of the formwork.” For Verhelst Bouwmaterialen, this was a particularly valuable project to work on, especially given the high standard of finish and the outstanding end result.
Olivier Salens: “That rhythm, inspired by the historic cloisters, was very important to us architecturally. And I find it very special to hear that it was important for production too. Thanks to good collaboration, and a great deal of patience on Verhelst’s part, we arrived at the right concrete mix. There is the lower structure, with the historic cloisters and a basement, and the upper structure of two storeys, concealed behind the louvres. Because the windows are set further back, it feels like a single storey, and we have effectively created a contemporary cloister, so characteristic of a monastery.”
Question about this story? Ask your question
Wie aan Weylerkazerne werkte
- ClientVDD Project DevelopmentMentioned in Olivier Salens Architecten designs smart solution for Weylerkazerne
- ArchitectSalens ArchitectenMentioned in Olivier Salens Architecten designs smart solution for Weylerkazerne
- Main contractorAlgemene Ondernemingen HimpeMentioned in Olivier Salens Architecten designs smart solution for Weylerkazerne
- prefabbetonnen lamellenstructuurVerhelst BouwmaterialenIn this story
Keep following this
Get an email when a new story is published. No account needed.
- ProjectWeylerkazerne
- SubjectMonuments
- CompanyVerhelst Bouwmaterialen