Comprehensive technical project delivered at record speed thanks to BIM
Text Tim JanssensImage Pacquet, Karel Waignein

Equipping a building with 3,500 m² of office space and 3,000 m² of storage space from start to finish with advanced energy-efficient systems in just eight months is a remarkable feat that few building services contractors can pull off. Ieper-based specialist Pacquet achieved it at grid operator Fluvius’s new regional site in Bruges, thanks to the extensive use of the BIM methodology. “This was the first time we had delivered a turnkey project on this scale, and the results are very positive,” says managing director Marijn Pacquet.

Since 1988, employees at Fluvius’s Bruges-Mid-Coast region, which serves eighteen cities and municipalities, have been based at their familiar headquarters on Scheepsdale Avenue in Bruges. Now, 37 years later, they are preparing for the long-awaited move to a new, future-focused site in the Blauwe Toren industrial zone, built on a strategically located plot along Blankenbergse Steenweg. For the project, Fluvius called on property developer ION, which had previously delivered a similar regional building with office and storage space in Ghent. Sustainability was naturally a key priority, reflected in the aim to make maximum use of advanced energy-efficient systems. That is why ION and main contractor Furnibo engaged the services of the renowned building services contractor Pacquet.


Entirely in-house
Pacquet was commissioned to develop the building services in detail, based on a concept note from engineering consultancy BM Engineering. “We designed all the systems ourselves, from start to finish, translating every theoretical requirement and specification into a buildable model,” explains Marijn Pacquet. “A BEO field, a heat pump, heating and cooling via climate ceilings … from a technical and environmental perspective, this building has all the bells and whistles. We also took care of the ventilation, plumbing and electrical installations.
Finally, we supported Siemens, Fluvius’s own systems integrator, with the installation of cabling across the site. So we handled everything from start to finish. Once again, we made extensive use of the BIM methodology, which we have applied consistently across all our projects since 2016. Our entire way of working is built around it, and we are reaping the benefits. The advantages are undeniable: more accurate planning, better estimates of the materials required and costs, efficient communication and coordination, a much lower margin for error on site …”

An extremely efficient process
BIM was also key to the successful delivery of Fluvius’s new regional site in Bruges, especially given the tight construction schedule. “We started installing the first ventilation ducts in the second half of April, and by the end of 2024 the building was more or less operational. We can look back on a highly efficient process, with the BIM model serving as the essential framework,” says Marijn Pacquet. “This was the first time we had delivered a turnkey project on this scale, and we are very pleased with the results. It is a project we are extremely proud of. Fluvius is also very satisfied with our contribution, as they have already asked us to submit a quote for another project. Our relationship with Furnibo, which has become a regular partner over the years, was excellent too. At the same time as the Fluvius project, we also delivered a new apartment building with eighteen luxury homes in De Panne, together, carrying out all the building services (heat pumps, PV system, charging points …) entirely in-house, from consultancy and design to installation. Another notable recent project is Union machines in Wielsbeke, where we equipped a new assembly hall with offices with energy-efficient systems, including air-to-air heat pumps to heat the assembly hall. In short, we continue to steadily expand our portfolio with excellent projects, where BIM adds tremendous value every time.”

Question about this story? Ask your question
Wie aan Regiosite Fluvius Brugge werkte
- property developerIONIn this story
- main contractorFurniboIn this story
- building services contractorPacquetIn this story
- engineering consultancyBM EngineeringIn this story
- technische ondersteuning
SiemensMentioned in Grid operator opts for a flexible, sustainable working environment - architectWielfaert ArchitectenMentioned in Grid operator opts for a flexible, sustainable working environment
- Studiebureau stabiliteitCOBE ingenieursMentioned in Grid operator opts for a flexible, sustainable working environment
Keep following this
Get an email when a new story is published. No account needed.
- ProjectRegiosite Fluvius Brugge
- SubjectBIM
- CompanyION
- CompanyFurnibo
- CompanyPacquet
- CompanyBM Engineering
- CompanySiemens


















