Yearbook

Building and building services engineering consultancy

De leeszaal van Rijksarchief Antwerpen.
De leeszaal van Rijksarchief Antwerpen.

Founded in 1992, Wommelgem-based engineering consultancy BOTEC is a dynamic firm providing building services engineering. Thanks to the dedication of its directors and staff, this leading company enjoys an excellent reputation in the construction sector. 

BOTEC’s core business is the design and coordination of all building services. With dedication and vision, its design team creates plumbing and sanitary systems, electrical installations, HVAC systems, transport systems, catering equipment, and medical and industrial gas distribution networks. As an expert with extensive experience in the healthcare sector, BOTEC is regularly commissioned for a wide range of new-build and renovation projects for residential care centres and hospitals. Educational establishments, offices and industrial buildings also feature in its portfolio. “All our designs prioritise the
efficient use of water, energy and raw materials as part of sustainable construction,” explains managing director Ilse Cromheeke.

The refurbished kitchen at WZC Sint-Jozef in Lier.

Climate-friendly technologies

BOTEC committed to climate-friendly technologies many years ago. In 2009, for example, it opted to use ground heat exchangers at WZC De Spoele in Sint-Niklaas, avoiding the need for active cooling. The same ecological solution was chosen at Hof ter Schelde in Antwerp, meaning the gas-fired heat pumps originally planned were not installed and the boilers’ thermal output was reduced by 10 %. “As lighting accounts for a large share of electricity consumption, we opted for LED lighting throughout in the 2014 design dossier,” says Ilse Cromheeke.

In 2015, Building Z at Universiteit Antwerpen incorporated, among other systems, a borehole energy storage (BEO) field, a six-pipe heat pump, a gas-fired heat pump and concrete core activation. Recent designs include the electrical installation for Rijksarchief Antwerpen, the complete replacement of the kitchen at WZC Sint-Jozef in Lier, and the expansion of the cooling system at WZC Filfurdo in Vilvoorde, completed in 2020 after BOTEC had designed all the technical installations for the new-build project in 2017. All installations, of course, comply with current legislation, which is continually evolving.   

Question about this story? Ask your question

Keep following this

Get an email when a new story is published. No account needed.

What you follow
  • SubjectYearbook
Share this article

Follow Bouwen aan Vlaanderen

Follow

Follow a project or company and you’ll receive an email whenever a new story appears. Follow a theme or topic and you’ll receive a weekly roundup. No account or password needed: every email includes a link to what you follow.