Den Bell tower in Antwerp gets a new (and warmer) look
Text uwtekst.beImage Régine Mahaux

Construction company Denys restored the façade of Den Bell tower, the City of Antwerp’s administrative building. They removed the natural stone façade panels, which were connected to the tower’s concrete frame as permanent formwork. They then tackled concrete cancer in the frame, insulated the tower and installed new façade panels. As the tower is a protected monument, its appearance after the energy-efficiency upgrade had to remain exactly as envisaged by the original architect.
A puzzle of façade panels
Den Bell tower is shining again. For a year, from November 2022 to November 2023, a Denys team installed 400-kilogram panels on the façade, covering a total of 2,250 square metres. Tony Paelinck: “We drew up the entire anchoring plan in advance, following an extensive stability study. The tower’s frame is a mix of concrete and brick, so different types of anchor were needed. Installation was a challenging puzzle, matching the right façade panels with the right anchors in the right places.”

Natural stone from France
Tony Paelinck: “We needed natural stone that closely matched the look and feel of the old façade panels. Our search led us to a company in western France, the only quarry able to extract the natural stone we wanted at the required delivery rate. To ensure we could install the panels without interruption, most of the stone was quarried before the first façade panel was fitted. This also required a substantial upfront investment. The natural stone blocks were processed into identical panels, some profiled and some not, in our own stonemasonry workshop.”
Minimising disruption
During the works, Denys took steps to minimise disruption to the neighbourhood. Part of the site signage was removed in the mornings and evenings, allowing normal traffic to use Sint-Laureisstraat. Deliveries to the building’s kitchen also continued as usual.
Smooth collaboration between project partners
Tony: “Looking back on the project, the stone supply was the biggest source of stress. We took more than half the quarry’s annual output, and it was the only quarry with the natural stone we had chosen. If that supply had dried up, we would have had a major problem. But everything went well. Another great thing about this project was the exceptionally good collaboration with the architect and the project officer from the City of Antwerp. When you get on well, you can see it straight away on site.”
Een zakelijke vraag aan Denys? Get in touch
Who worked on it
De toren van Den Bell in Antwerpen
- Construction company
Denys
Keep following this
Get an email when a new story is published. No account needed.
- ProjectDe toren van Den Bell
- SubjectYearbook
- CompanyDenys