Yearbook

Energy-efficient building services that save clients money

Text uwtekst.beImage BOTEC

Vier gaswarmtepompen verwarmen de woonblokken op het Prins-Regentplein in Kessel-Lo.
Vier gaswarmtepompen verwarmen de woonblokken op het Prins-Regentplein in Kessel-Lo.

BOTEC designs energy-efficient building services, integrates them into buildings and coordinates their installation. Honest, personal contact with the client, architect and contractors is central to its approach to projects. Hospitals, residential care centres and child and youth care organisations, among others, regularly turn to the engineering consultancy. “That’s because we have built up valuable experience in the care sector over the past thirty years,” says managing director Ilse Cromheeke. BOTEC also equips schools, offices, industrial buildings and collective housing projects with sustainable technologies.

Ilse Cromheeke: “Our projects focus on the rational use of energy, water and raw materials, and on keeping the client’s operating, maintenance and energy costs as low as possible.” At Prins-Regentplein in Kessel-Lo, BOTEC equipped two renovated residential blocks with a low-temperature communal heating system, heat pumps and solar panels. “Four gas-fired heat pumps on the roof power the heating system. In each home, a heat pump booster produces domestic hot water. Solar panels on the roof of each home keep residents’ energy bills as low as possible.”

Two air-to-water heat pumps heat and cool UAntwerpen’s Paardenmarkt site.

Paardenmarkt City Campus 

UAntwerpen restored its Paardenmarkt City Campus buildings for the Product Development course and computer rooms for three hundred students. The project won Het Erfgoedjuweel 2023, awarded by the city of Antwerp. Designer Tom Mertens: “Because computers and printers blow out dry, dusty air, we decided to equip the buildings with a type D ventilation system. Sensors in each room measure CO2 levels and temperature to control it. A centrally suspended fabric duct delivers the air silently and distributes it evenly. Following a cost-benefit analysis, we decided to install two air-to-water heat pumps to compensate for ventilation heat losses in winter and cool the rooms in summer.”

“On the fourth floor, we created a central data room for the computer rooms in buildings D and E. Each room was fitted with access control, CCTV and the latest generation of LED lighting, controlled by daylight. With video screens that let all students see lecturers’ presentations up close, centrally controlled speakers and full Wi-Fi coverage, the buildings are fully equipped for the future.”

Sint-Jozef Care Campus 

At Ingenium’s request, BOTEC supervised the installation of the building services at Zorgcampus Sint-Jozef in Ekeren. Ilse Cromheeke: “The construction period for a project like this was short, and the client had opted for CLT construction, so the work had to be completed as quickly as possible. Efficient communication is also essential on a site of this size. For both reasons, we used BIM. This meant all the construction partners were immediately kept up to date with the latest changes.”    

Question about this story? Ask your question

Keep following this

Get an email when a new story is published. No account needed.

What you follow
  • SubjectYearbook
Share this article

Follow Bouwen aan Vlaanderen

Follow

Follow a project or company and you’ll receive an email whenever a new story appears. Follow a theme or topic and you’ll receive a weekly roundup. No account or password needed: every email includes a link to what you follow.