SILT opts for intensive ventilation with robust DucoWall louvre wall
Text and images DUCO

The SILT project in Middelkerke is a new landmark on the Belgian coast, set between the sea wall and the dunes. It replaces the former casino and blends seamlessly into Epernayplein. The building’s design draws inspiration from the historic coastal landscape while incorporating contemporary architectural elements. The integration of the entire complex into the landscape, in the form of an artificial dune housing the events hall, restaurant and casino, creates a unique fusion of nature and architecture. DUCO was engaged to provide intensive ventilation for the car park and the entire building.
Arne Baeyens of Furnibo, the lead contractor, explains: “The design of SILT pushes the boundaries of traditional casino architecture. Instead of a closed box, we have created a versatile project embedded in the public dune landscape.” The choice of materials was crucial to achieving this aim. The hotel tower, or ‘the bollard’, is clad in cross-laminated timber (CLT), a sustainable material that reduces CO2 emissions and complements the natural aesthetic of the coastal landscape. The artificial dunes and the cantilevered sections above the hotel terraces act as energy-saving features, providing shade in summer and insulation in winter. This design, combined with the use of night-time cooling, significantly reduces the need for active cooling systems.


Ventilation solutions
Given the building’s location and design, intensive ventilation was an important consideration. To meet this need, the DucoWall Classic louvre wall system was installed on both the ground floor and the upper floors of the building. The louvre wall on the ground floor controls ventilation in the car park, while the louvre wall on the roof ventilates the entire building.
Arne Baeyens explains the choice of DucoWall Classic: “The curved sections in the design required a solution that could accommodate these shapes while retaining strength and functionality, particularly in a coastal environment. DUCO’s louvre wall system meets these requirements. The option to customise the louvre system in RAL colours was an additional benefit, ensuring the design’s aesthetics were not compromised.”
Collaboration and delivery
The success of the SILT project was made possible by close collaboration between the various stakeholders. Reflecting on this collaboration, Arne Baeyens notes: “DUCO was always available to provide additional advice and supplied the necessary calculations and certificates for installation on the coast. The installation was carried out by Habemo, and the agreements on installation, timing and working methods were duly observed.”

Have a business enquiry for DUCO? Get in touch
Wie aan SILT werkte
- clientGemeente MiddelkerkeMentioned in Inspired architecture, ground-breaking construction expertise and masterful marketing
- construction teamBouwteam NautilusMentioned in Inspired architecture, ground-breaking construction expertise and masterful marketing
- designTJIP interior architectureMentioned in Inspired architecture, ground-breaking construction expertise and masterful marketing
- GlazingPolypaneMentioned in Inspired architecture, ground-breaking construction expertise and masterful marketing
- façade contractorAllaertMentioned in Inspired architecture, ground-breaking construction expertise and masterful marketing
- boor- en zaagwerkenZaboMentioned in Inspired architecture, ground-breaking construction expertise and masterful marketing
- vliesgevel- en daksysteem ConceptWall 50
Reynaers AluminiumMentioned in SILT: A new landmark on the Belgian coast, featuring Reynaers Aluminium’s ConceptWall 50 curtain wall and roof system - vakmanAllaert AluminiumMentioned in SILT: A new landmark on the Belgian coast, featuring Reynaers Aluminium’s ConceptWall 50 curtain wall and roof system
Keep following this
Get an email when a new story is published. No account needed.
- ProjectSILT
- SubjectYearbook
- CompanyDUCO


















