Construction projects

A business building with a global outlook

De nieuwe Nutrex-site bestrijkt 12.500 m². Daarop liet Jeni circa 2.000 m² kantoor- en sociale ruimte, bijna 3.000 m² productiehallen en ruim 3.500 m² magazijnruimte optrekken.
De nieuwe Nutrex-site bestrijkt 12.500 m². Daarop liet Jeni circa 2.000 m² kantoor- en sociale ruimte, bijna 3.000 m² productiehallen en ruim 3.500 m² magazijnruimte optrekken.

Last summer, Nutrex employees moved into a brand-new building in the business park between the Albert Canal and the E313 in Olen. Highlights include its fresh appearance, timeless interior and 27-metre-high production tower.

Nutrex specialises in developing, producing and selling high-quality feed additives worldwide. The company had been based in nearby Lille for a quarter of a century, but had outgrown its premises. Property developer Jeni Real Estate already owned the necessary building plots in Olen. The new Nutrex site covers 12,500 m². Jeni commissioned around 2,000 m² of office and staff facilities, almost 3,000 m² of production halls and over 3,500 m² of warehouse space, designed by mortelmans van tricht architecten.

The offices are at the front of the building and the production area at the rear.

A smart machine

“The production area is housed in a tall volume at the rear of the building. The various silos and fully automated production and packaging installations are combined within it to form a smart vertical machine,” says project architect Chris Schelkens (mortelmans van tricht architecten). On the ground floor, products are finished and packaged, dispatched or stored in the
dust-free warehouse.

The offices benefit from abundant natural light.

“From a construction point of view, the production area was extremely complex, as it had to be coordinated with the machinery to a very high degree of precision,” Schelkens explains. “We had to bring the building and the machinery together as one. The fire safety concept also required special attention, as this type of building falls outside the standard fire regulations.” With advice from FPC Risk’s specialists, a concept was developed that provides efficient compartmentation and limits the risk of dust explosions, while also meeting the requirements of the Federal Agency for the Safety of the Food Chain and providing a workable production environment. “A curious detail: the location of the 27-metre-high production tower was determined not by Nutrex’s operational processes, but solely by the 45° planning rule imposed by the municipality of Olen.”  

The pendant lights also contribute to the new building’s representative character.

Designed around the site orientation

The offices are at the front of the site. “We made clever use of the angle between the plot and the public road to combine the office spaces with a spacious ‘plaza’ featuring an atrium, usable outdoor areas, terraces and a covered entrance. The plaza is the central space in the office, where people meet for a quick discussion, something to eat or drink, or a moment to unwind. We located the more private areas, where greater concentration is needed, around the perimeter, away from the plaza.” 

One wing of the office building has been compartmentalised separately and fitted out for rental for the time being. “In the longer term, this office space could accommodate Nutrex’s own growth.”

Reception desk in veined Italian marble.

Interior

As part of its turnkey service, Jeni Real Estate offers its industrial and residential clients not only shell buildings with basic finishes, but also fully fitted-out interiors. Nutrex was glad to take advantage of this. “Nutrex welcomes clients from all over the world in its representative spaces,” says Tamara Vermeersch, interior project manager at Jeni. “The interior therefore needed a timeless look that did not lean towards any particular cultural region. Ease of maintenance was another priority.”

The timeless interior does not lean towards any particular cultural region.

One eye-catching feature is the reception desk, made from Fior di Bosco, a grey-brown, veined Italian marble. The floors
in the communal areas are finished with beige ceramic tiles measuring 60 x 60 and 90 x 90 cm, depending on the function of the space. “The offices and meeting rooms, on the other hand, have carpet tiles. Their glass walls were chosen for their excellent acoustic properties.”    

Vossal: Aluminium external joinery

Installing the aluminium external joinery and glazing at the new Nutrex building was right up Vossal’s street. “We built the curtain wall using Reynaers Aluminium CW 50 profiles, and the other windows and doors with the ML 8 system, also from Reynaers,” says managing director Hans Eysermans. Vossal also installed Renson Fixscreen solar shading and louvre grilles.

Vossal was founded in 1978. Although it now employs around 60 people, it remains a true family business. “We undertake projects of this scale as well as smaller commissions and private homes. We handle every aspect of the work ourselves. Engineering, drafting and assembly take place in our workshop, and our own installation teams carry out the work on site. We are currently working on the new care buildings and day centre for vzw Borgerstein in Sint-Katelijne-Waver, designed by archipelago and Stéphane Beel Architects. We are also helping to build a new research building for UZA in Edegem, between the existing hospital and the care hotel. Designed by SVR-ARCHITECTS, the new building will also house a Red Cross donor centre.”

Alterieur: Resin flooring and shower room walls

Although the shower room has no windows, Nutrex employees can enjoy a bright environment. “That is because we finished the resin floor and walls in RAL 9010, a white shade,” says Erik Hendrix, founder and managing director of Alterieur (Turnhout). “Polyurethane is a flexible material that ‘moves with’ the room’s intensive use. Because it is applied as a seamless coating, there is no joint between the floor and wall where mould or other contaminants can take hold.”

Alterieur was founded 15 years ago. “Resin flooring was nothing new, but at the time its use was largely limited to industrial and public buildings. This meant it was mainly a market for larger players. We saw opportunities in the residential sector too. For private homeowners, the sleek appearance and wide range of shades and colour combinations are just as important as the hygienic benefits. Alterieur now has six employees, but we are actively recruiting,” says the managing director.

TECHNICAL DETAILS

Client Jeni Invest (Turnhout)

Architect mortelmans van tricht architecten (Antwerp)

Main contractor(s) De Pelsmaeker (Westerlo)

Question about this story? Ask your question

Who worked on it

Bedrijfsgebouw Nutrex in Laakdal

  1. ClientJeni Invest (Turnhout)
  2. Architectmortelmans van tricht architecten (Antwerp)
  3. main contractorDe Pelsmaeker (Westerlo)
  4. adviceFPC Risk
  5. aluminium buitenschrijnwerkVossal (Beerse)
  6. gietvloer en wanden in doucheruimteAlterieur (Turnhout)

Keep following this

Get an email when a new story is published. No account needed.

What you follow
  • ProjectBedrijfsgebouw Nutrex
  • SubjectConstruction projects
  • CompanyJeni Invest (Turnhout)
  • Companymortelmans van tricht architecten (Antwerp)
  • CompanyDe Pelsmaeker (Westerlo)
  • CompanyFPC Risk
  • CompanyVossal (Beerse)
Share this article

Follow Bouwen aan Vlaanderen

Follow

Follow a project or company and you’ll receive an email whenever a new story appears. Follow a theme or topic and you’ll receive a weekly roundup. No account or password needed: every email includes a link to what you follow.