“P+R Linkeroever valt sowieso in de klasse van uitdagende opdrachten”, vertelt projectmanager Christophe Van den Bossche.
“P+R Linkeroever valt sowieso in de klasse van uitdagende opdrachten”, vertelt projectmanager Christophe Van den Bossche.

P+R Linkeroever is a unique car park, not only in terms of its appearance and design. Its building services also put it at the top of its class. VINCI Energies’ Total Technical Solutions approach, with ITB working closely with Cegelec, TranzCom and VINCI Facilities, delivered a state-of-the-art solution defined by integration, safety and sustainability.

108 cameras, 1,255 sensors indicating which parking spaces are available, 225 motion detectors, 10 kilometres of cable containment, 13 low-voltage switchboards, 1,011 fire detectors, 72 sirens, 1,000 kVA of electrical charging capacity, 125 charging points (with basic infrastructure that can be expanded to accommodate up to 750), 4G/Astrid, an electronic car park management system, 91 fire hose reels, 78 fire extinguishers and a fire pump with a capacity of 200 m³/h at 11 bar: P+R Linkeroever has become a technological tour de force. 

P+R Linkeroever has become a technological tour de force.

High-tech, sustainable and safe

ITB, as the main building services contractor on the project, looks back on it with considerable pride. “P+R Linkeroever was always going to be a challenging assignment,” says project manager Christophe Van den Bossche. “Its sheer variety was what made it so complex. Yet these are precisely the kinds of projects where we can make a difference. As part of VINCI Energies België, we have access to an enormous wealth of knowledge and expertise in areas beyond our core business. What’s more, bringing together our strengths under one roof always leads to better integration. On this project, that approach enabled us not only to deliver impressive technology, but also to achieve an exceptionally sustainable and safe result.”

ITB was responsible for the electrical installations and for coordinating all the works relating to the building services. Cegelec was brought in to handle the plumbing, HVAC and fire hose reels. TranzCom was tasked with ensuring that the building complied with the regulations for ASTRID and 4G. “Once the car park is operational, a fourth VINCI Energies business unit will also come on board,” says Christophe Van den Bossche. “VINCI Facilities will be responsible for maintaining both the building and its technical installations.”    

Question about this story? Ask your question

Wie aan P+R Linkeroever werkte

  1. gelamelleerde houten liggersStructureWoodMentioned in Pushing the boundaries with timber
  2. main contractorITBMentioned in Strength in numbers, added value
  3. ASTRID en 4GTranzComMentioned in Strength in numbers, added value
  4. maintenanceVINCI FacilitiesMentioned in Strength in numbers, added value

Keep following this

Get an email when a new story is published. No account needed.

What you follow
  • ProjectP+R Linkeroever
  • SubjectConstruction projects
Share this article

Advertisement

Follow Bouwen aan Vlaanderen

Follow

Follow a project or company and you’ll receive an email whenever a new story appears. Follow a theme or topic and you’ll receive a weekly roundup. No account or password needed: every email includes a link to what you follow.