Clean design, plenty of natural light and a green façade

The AD Delhaize store in Waregem has already made its mark on history. On 13 July 2022, the long-awaited moment finally arrived, and the Dewitte family proudly presented its brand-new store to the public, with its larger sales area as the ultimate asset. The successful collaboration between the architect, interior architect and contractor has resulted in a unique shopping experience.

The architecture and engineering firm dubbeldee, named after its managing director and architect Dominiek Depoortere, is a familiar name in its home town of Waregem. With extensive experience in residential and apartment construction, as well as industrial buildings and projects for public authorities, the firm has expertise across the board. It is no surprise, then, that the client enlisted it to develop a new concept for the AD Delhaize in Waregem. “We quickly found we shared the Dewitte family’s approach and vision for the project. Together, we developed the design,” says Dominiek Depoortere. “Following a successful previous collaboration with contractor Van de Walle IBC, we suggested that the client invite them to tender.” Based in Aalter, Van de Walle IBC draws on more than 35 years’ experience in a range of industrial turnkey projects. Its in-depth expertise made it the ideal partner to deliver this project.

A thoughtfully designed retail complex
The client’s brief was ambitious. Dominiek Depoortere explains: “The plan was to repurpose the existing store and build a new four-storey building alongside it. The new building comprises a 2,935-square-metre underground car park; a ground floor of around 3,465 square metres, housing the AD Delhaize and storage space; a 900-square-metre mezzanine with storage, staff facilities and offices; and a second floor with a bowling alley, covering a further 3,341 square metres. The car park was completely redesigned, and now offers a total of 250 spaces.”

Van de Walle IBC carried out all the shell and core work, from the basement to the roof, as well as the external works. “One logistical challenge during construction was keeping the old store open and accessible,” says senior project manager Frederik Van Steenbrugge. “In terms of traffic, we aimed for smooth circulation for pedestrians and cyclists, who now have a separate entrance to the site, as well as for cars and lorries.” The new building was thoroughly insulated with polyurethane and PIR. Waste heat from the store’s substantial refrigeration systems is used to heat the building. Solar panels and a green roof further improve energy efficiency and sustainable water management.

Aesthetic design
The client wanted a high-quality, functional building without compromising on aesthetics. “The building is made up of a concrete frame with long spans, which posed a technical challenge. To keep columns to a minimum in the retail space, for example, we installed eight prestressed beams weighing no less than 22 tonnes each. The insulated concrete panels on the exterior façade were painted black to achieve a clean look. Large windows maximise natural light,” Dominiek Depoortere continues.

“An active green wall has been installed on the two stairwells at the store entrance, featuring real plants watered with rainwater collected from the green roof. The mezzanine offices offer a view across the entire store, where the exceptionally high ceilings, at just over 5 metres, create a tremendous sense of space. The canopy of the new building also extends along the old store to create a uniform appearance. Finally, a walkway has been laid along the entire front façade, which is around 94 metres long, connecting the old and new buildings. It is a fine project that ran particularly smoothly thanks to excellent cooperation between all the partners involved, including interior architect Eefje Vandemaele. As a team, we can rightly be proud of the result.”
Question about this story? Ask your question
Who worked on it
Winkelcomplex AD Delhaize Waregem in Waregem, nieuwbouw
- ClientDemalis nv
- architectdubbeldee Architecten & Ingenieurs
- interior architectDesigned by Eefje
- main contractorVan De Walle IBC
- aluminium raampartijenElox International
- solar panelsSolora
Keep following this
Get an email when a new story is published. No account needed.
- ProjectWinkelcomplex AD Delhaize Waregem
- SubjectConstruction projects
- CompanyDemalis nv
- Companydubbeldee Architecten & Ingenieurs
- CompanyDesigned by Eefje
- CompanyVan De Walle IBC
- CompanyElox International