Company profile: Stabilogics | Structural calculations with a practical focus

From Flanders to Wallonia and from Paris to Russia, Stabilogics calculates construction projects of all types and sizes. All its engineers work from Kampenhout. “Unlike many of our competitors, we have deliberately chosen to keep everything in-house in Belgium,” stresses Eddy Hermans.
Since 2000, Stabilogics has been providing accurate calculations for steel structures, concrete structures and buildings with extensive glazing. Today, just over 20 people work there every day, with a focus on industrial construction and petrochemical projects. The company’s portfolio also includes residential projects and office buildings.
Calculations from A to Z
Using the architect’s design as a starting point, Stabilogics carries out the entire structural analysis in-house, right through to practical production drawings. Eddy Hermans explains: “What sets us apart is our strong focus on execution. It is no coincidence that many of our clients are contractors. Our engineers are experts in current standards. They calculate material requirements economically and lay the foundations for efficient production and assembly. This helps contractors achieve lower construction costs. The cost of the design work is more than offset as a result.”

Thanks to Stabilogics’ expertise, the construction cost of Pavilion 6 in Paris was a full 700,000 euros lower.
Pavilion 6 in Paris
Stabilogics is mainly active in Belgium. However, it also regularly takes on projects abroad, including in France and even Russia. One prestigious Parisian project that Stabilogics worked on was Pavilion 6. Designed by architect Jean Nouvel, the exhibition hall combines steel and concrete structures to create a unique artistic environment. “We had worked with the main contractor before, after they were impressed by our work for one of their subcontractors on a project at Charles de Gaulle Airport,” Hermans explains.
Lower construction costs
The engineers not only carried out the complete calculations for the project, but also turned the results into production drawings, providing a direct basis for controlling the CNC machines. This makes errors during production virtually impossible. “Highly cost-effective,” says Eddy Hermans. “The contractor for the Paris project had drawn up its initial estimate. Thanks to our calculations and practical experience, the final construction cost was a full 700,000 euros lower.”