High-tech headquarters as showcase for IT specialist

Haasrode Research Park is set to welcome another impressive office building. The new headquarters of technology company Simac ICT België is taking shape on the business park south of Leuven city centre, with the renowned Brabanthal as its main attraction. The company wants to turn its future home into a living showcase. The building is due for completion in spring 2023, but it is already clear that this eye-catching structure embodies sustainability and technical ingenuity in every respect.

Simac ICT België has been a fixture in its field for fifty years. The company was founded in 1972 as a regional branch of the Dutch family business Simac and has local offices in Heverlee, Wemmel, Pulderbos, Lummen, Bastenaken and Maisières. Its head office has been in Kortenberg since 1997, but it no longer reflects the dynamic, forward-looking image of Simac ICT België. That is why a brand-new base with space for 140 employees is being built at Haasrode Research Park, where the company already had a satellite office with a warehouse.

Concrete as a recurring theme
The impressive office building was designed by Architects in Motion and is being built by Vanhout. “The new headquarters has a footprint of approximately 2000 m² and comprises three levels: an underground car park and two above-ground floors with offices and a warehouse of approximately 300 m²,” says Michiel Wielockx, project manager at Vanhout (part of BESIX Group). “We first drilled foundation piles, then installed cast-in-situ columns on the foundation pads to build the underground car park. We then poured a concrete floor slab, 40 cm thick in some areas and 50 cm in others. The ground floor and first floor were built in the same way. Apart from the central functional core (approximately 150 m²), the building rests entirely on concrete columns, which are round at the entrance. Most of the exposed concrete remains visible, and the result is impressive! The warehouse section, meanwhile, is made of prefabricated elements (IV beams, sandwich panels, steel decking …). Specific steelwork was also required. For example, an attractive steel staircase with glass balustrades has been installed in the entrance area.”

Advanced building services
As an energy-efficient BEN building, the new headquarters of Simac ICT België is a model of environmental performance. It is also packed with advanced building services. The roof is covered with solar panels, and a BEO field with fifty boreholes, combined with heat pumps, provides geothermal heating and cooling. Thermally activated concrete is used in the ceiling/floor slab between the two above-ground floors. Reheating coils provide additional support when needed. Almost all the building services are integrated into the raised floors on the office levels, making future modifications or extensions relatively straightforward. 24 charging points for electric vehicles are being installed, and rainwater harvesting is also part of the design. Employee wellbeing was another key priority. Extensive home automation applications help ensure additional comfort.
“For example, the intensity of the LED lighting can be adjusted automatically according to the amount of daylight entering the building,” explains Michiel Wielockx. “Naturally, a great deal of attention has also been paid to IT and the associated data cabling, as well as to CCTV and access control. Simac ICT België took responsibility for these packages itself, since this is logically a showcase project for the company.”

Complex façade detailing
Construction is now in the home stretch. Groundworks began in early August 2021, and the shell was completed by the end of March 2022. The façade work then took more than six months. “A lot of folding work and specific detailing was involved,” explains Michiel Wielockx. “The curtain wall is complemented by perforated vertical aluminium fins.” As the fins vary in depth, they give the façade a wave-like appearance. The entrance is also conceived as a volumetric incision, creating the impression of a door left ajar. The ceiling, which consequently slopes slightly, is finished in Corian. “All this certainly made it a special and forward-looking project. Fortunately, relations with the architect and client are excellent. Having made many key decisions and placed orders at the end of last year also helped keep the impact of price rises and late deliveries within bounds. As a result, the project has progressed smoothly. We will be able to hand over the building in spring 2023.”
Question about this story? Ask your question
Who worked on it
- ClientSimac ICT België (Kortenberg)
- Architectarchitect Bart Janssens, Architects in Motion (Turnhout)
- Main contractor(s)Vanhout (Geel)
Keep following this
Get an email when a new story is published. No account needed.
- SubjectConstruction projects