From mid-November, staff at the City of Brussels were able to familiarise themselves with Brucity, their new workplace in the heart of the capital. Its elegant, ambitious and futuristic architecture makes it a unique building, as do the many energy-efficient systems installed there. The latter are the work of Cegelec, which was responsible for all the technical packages, including HVAC, plumbing, electrical systems, sprinklers and smoke extraction.

Most of the parking spaces are equipped with electric vehicle charging points, in line with the objectives for green mobility.

From the outset, the building’s architecture had to fit within the sustainable development concept. Mission accomplished: Brucity was ultimately awarded a BREEAM Very Good rating. Its environmental footprint and operating costs were minimised as far as possible from the design stage onwards. 

Brucity has a total heating capacity of 3 MW and a total cooling capacity of 3.5 MW.

Enormous quantities

“For the electrical package, we installed two separate networks: one for Interparking, which manages the public section of the underground car park, including a high-voltage substation and generator, and a second high-voltage network serving the floors used by the city. This includes a UPS, LED lighting controlled intelligently using occupancy detection, a KNX system, a Wi-Fi network and a mobile phone network throughout the building, and 250 cameras monitored from the control room at level +0.5,” says Jean-Marc Warichet, Business Unit Manager Electricity at Cegelec. “We did not encounter any major technical difficulties as such, but to give an idea of the sheer scale of this project, each service counter has more than six data points, and we installed 170 kilometres of copper data cabling, 5 kilometres of fibre-optic data cabling and 15.5 kilometres of power and distribution cables. Those are enormous quantities. And let’s not forget the solar panels, which are architecturally integrated into a canopy around the top floor. They are completely invisible from the outside.”

The LED lighting is controlled intelligently using occupancy detection.

Scheduling, coordination and quality

Vincent Deleersnyder, Business Unit Manager HVAC and Plumbing, adds: “The biggest challenge was not so much the technologies used as meeting the tight schedule during a period made more difficult by the outbreak of the coronavirus, while ensuring good coordination between the various parties working on site. As for the HVAC systems, we installed the latest generation of dynamic ceiling heating and cooling. A few key figures give an idea of the scale: an air flow rate of 240,000 cubic metres per hour, distributed across four air handling units, a total heating capacity of 3 MW and a total cooling capacity of 3.5 MW. Coordination was made considerably easier by the use of 3D technology, the contractor’s lean approach and daily meetings with the site managers. The focus was clearly on the quality of the work, much to the client’s satisfaction. In this respect, we would like to congratulate and thank the entire team, which delivered exemplary work and met the deadline.”   

Question about this story? Ask your question

Wie aan Brucity werkte

  1. automatische schuifdeuren en sensorsluizendormakaba BelgiumMentioned in Transparency takes centre stage in impressive administrative centre
  2. ClientStad BrusselMentioned in Transparency takes centre stage in impressive administrative centre
  3. ClientAG Real Estate DevelopmentMentioned in Transparency takes centre stage in impressive administrative centre
  4. ArchitectTM B2Ai architectsMentioned in Transparency takes centre stage in impressive administrative centre
  5. ArchitectBruno Albert architecte & associésMentioned in Transparency takes centre stage in impressive administrative centre
  6. Main contractorTM BAM InterbuildMentioned in Transparency takes centre stage in impressive administrative centre
  7. Main contractorCIT BlatonMentioned in Transparency takes centre stage in impressive administrative centre
  8. interieurinrichting op maatReyndersMentioned in Transparency takes centre stage in impressive administrative centre
  9. technische lotenCegelecIn this story
  10. liftsSchindlerMentioned in State-of-the-art lifts take Brussels’ city hall to new heights

Keep following this

Get an email when a new story is published. No account needed.

What you follow
  • ProjectBrucity
  • SubjectConstruction projects
  • CompanyCegelec
Share this article

Advertisement

Follow Bouwen aan Vlaanderen

Follow

Follow a project or company and you’ll receive an email whenever a new story appears. Follow a theme or topic and you’ll receive a weekly roundup. No account or password needed: every email includes a link to what you follow.