Brewery 2.0 in Brussels’ canal zone

Brussels Beer Project (BBP), an ‘urban beer brand’ launched in 2013, is reaping the rewards of close collaboration with the local community. It embodies a distinctive vision of life in the capital: multicultural, contemporary, vibrant and full of life. As well as producing tasty beers such as Delta IPA, Grosse Bertha and Babylone, BBP also aims to be a model of corporate social responsibility. The new brewery building beside the canal in Anderlecht reflects the company’s sustainable, circular business philosophy, thanks to close synergies between the production process and energy management. It was a major challenge, and one the engineers involved were more than happy to get their teeth into.
BBP’s new brewery has been built at the Biestebroekdok in the ‘Haven Zuid’ district. Designed by OFFICE Kersten Geers David Van Severen, the building enhances the new urban landscape in Brussels’ thriving canal area with its colourful roof, open layout and visible brewing equipment.
Although engineering consultancy Boydens Engineering has already worked on several breweries, BBP’s new premises were a different proposition. Nassim Jamali, Building Performance Consultant at Boydens Engineering: “This was an industrial project in the heart of Brussels for a client not used to projects of this scale. It is their first major brewery building, following their microbrewery in Antoine Dansaertstraat. On the technical side, we also had to take account of all the brewing techniques, which fell outside our remit. This required extensive consultation between the brewery, the architect and our engineers.”

Energy synergies
The main aim of the technical concept was to create an optimal synergy between the brewery itself, meaning what it produces and the energy generated in the process, and the building services. This was to ensure a comfortable indoor climate and make maximum use of the available resources.
It all starts with an architectural design that minimises energy demand: an optimally compact form, a high-performance building envelope and good insulation to reduce heat loss. Glazing is located on the north-facing façades, striking the right balance between natural daylight and limiting the risk of overheating in summer. Nassim Jamali: “During the competition phase, the project’s orientation was reversed for logistical reasons, but this did not make sense from an energy perspective. BBP initially underestimated the importance of renewable energy in its brewing processes. We went from a few solar panels to almost 120 (40 kW), and BBP is even considering installing more on the roof at a later stage, ideally facing south.”
Carbon-neutral building
The brewing process generates a huge amount of heat. Nassim Jamali: “We recover all the hot water used for brewing in a buffer tank, as well as the heat continuously generated by the refrigeration system, thanks to a heat exchanger. There is therefore no need for additional heating or cooling in the building, as we recover all the energy from the brewing process for heating. This enabled us to make the building carbon-neutral, even though a gas condensing boiler had originally been specified.” All the harvested rainwater is used for sanitary facilities and irrigation. It might have been possible to go further by incorporating it into the passive cooling of the brewery equipment, but that was outside Boydens’ scope.

Sustainable comfort
A building like BBP’s also needs to provide thermal comfort in the production area, which becomes hot and humid during brewing. The ventilation system was therefore oversized to ensure ‘free cooling’ at all times. It operates in four different modes, combining whether or not brewing is under way with the winter and summer settings. Nassim Jamali: “We managed to install this huge ventilation unit (25,000 m³/h) despite the constraints on size and height.”
The integration of technology into the architecture is another notable feature of the project. Most of the building services and brewing equipment have been left exposed. Needless to say, this created plenty of headaches for the engineers when it came to coordination and supervision, with the sloping roof adding to the challenge. On the other hand, some systems had to be concealed at all costs, such as the extractors for the fire detection system. Boydens Engineering was also responsible for designing the feature lighting, which had to be adapted to the different areas (offices, tasting room, production hall, etc.).
BBP’s new brewery is nearing completion. Although we will have to wait a little longer for the first feedback on how the systems are working, we can already enjoy a good beer there, more specifically in the ‘Beer Garden’. Or, to quote BBP’s slogan: ‘Leave the abbey, join the playgound’!
Question about this story? Ask your question
Who worked on it
- ClientBrussels Beer Project (Anderlecht)
- ArchitectOFFICE Kersten Geers David Van Severen (Brussel)
- Building services consultantBoydens Engineering (Zedelgem)
Keep following this
Get an email when a new story is published. No account needed.
- SubjectSustainable construction