During the coronavirus pandemic, many travel enthusiasts (re)discovered Belgium as a holiday destination. From this autumn, there will be more options for a so-called ‘staycation’, with ‘the most sustainable holiday park in the country’ opening in Hechtel-Eksel. This accolade is well deserved: circular CLT architecture, renewable energy, maximum rainwater recovery and minimal hard landscaping, and optimum integration into the natural environment. The ambitions are clear: to give the concept of a ‘peaceful stay amid greenery’ a new dimension.
The story of the holiday park in Hechtel-Eksel, in the heart of the Limburg Kempen, began in 2015. The old, dilapidated campsite, which blighted the recreational area of Exelshof in Bosland nature reserve, was demolished to make way for a new development. Client Life Tree Group worked with Wood Architects, then still operating under the name Aché Ligno Architecten, to develop a forward-looking concept for a small-scale holiday park that shows the greatest possible respect for local nature. Operator Roompot came on board in 2018. The rest is history: an attractive development of 121 comfortable holiday homes rose amid the greenery
84 homes for four people (two bedrooms), 32 homes for six people (three bedrooms) and five homes for sixteen people (eight bedrooms). All guests will have access to a fully equipped kitchen, comfortable beds and a cosy living room with a TV. A shop, shared laundry and restaurant with terrace complete the picture.

Circular CLT architecture
Sustainability was priority number one from the outset of the new holiday park’s development. The homes, for example, are built almost entirely from timber sourced from PEFC-certified European forests. “Given our extensive expertise in innovative timber construction, we opted for circular CLT architecture, an absolute first for a Belgian holiday park. The trapezoidal forms, with angled walls and sloping roofs, create a distinctive sense of dynamism,” says Piet Kerckhof, founder and senior architect at Wood Architects. “Apart from the concrete ground slab, all the homes can be fully dismantled and reused. The materials have been selected and combined to maximise their recoverability in the future. For example, the EPS insulation will be only minimally contaminated by the rendered façade finish: at most, a thin layer will need to be cut away. The EPDM roof membrane was also made to size before delivery, so no cutting or joining was needed on site. In terms of the site layout, we also wanted to steer well clear of a conventional campsite and create a more open feel. That is why we clustered the accommodation units in several circles, with small communal courtyards that offer the necessary privacy.”

Recycled floor insulation and green roofs
That was not all. Many other measures were taken to make the holiday park as sustainable as possible. “We did not opt for traditional foundations, but for an ecological ground layer and an insulating stabiliser made from recycled glass aggregate,” explains Piet Kerckhof. “In addition, all 136 structures on the site are equipped with extensive green roofs, which together hold back 70,000 litres of rainwater each year and discharge it gradually into swales. This made a separate sewer system unnecessary, and a single sewer for wastewater was sufficient. The remaining rainwater infiltrates into the ground on site, as hard landscaping accounts for just 8% of the site. Most of the park’s roads are surfaced with natural dolomite or grass pavers. Not a single drop of rainwater therefore enters the sewer system. For heating and cooling, we use heat pumps powered by green electricity, supplied in part by solar panels on the communal building. Last but not least, native planting was chosen to help the development blend into its natural surroundings. In short, together with client Life Tree Group, we have done everything possible to achieve the highest standards of sustainability!”

One and a half homes a day
The new holiday park will open this autumn. “We are still perfectly on schedule. Groundworks began in February last year, just before the coronavirus pandemic broke out. We came to a brief standstill during lockdown, but used that time to assemble three prototype homes and optimise the logistics,” says Piet Kerckhof. “We designed the CLT structure of the homes entirely in 3D, including all the service penetrations, so that production plans could be generated easily: a sort of ‘BIM light’. Assembly of the homes, which arrived on site, so to speak, as ready-to-build kits, began in August 2020, at a rate of one and a half units a day. We had to make adjustments here and there because of the pandemic, but overall everything went smoothly. For a small practice like ours, it was wonderful to deliver such a large-scale flagship project. It may sound old-fashioned, but we really think of this holiday park as our own child, one we brought into the world with great anticipation and watched grow, little by little, into a beautiful creation. In short, we are very proud of it!”
The benefits of CLT
There is no coincidence that the new holiday park in Hechtel-Eksel is built in CLT. Wood Architects has worked exclusively with timber construction since 2013. “CLT structures consist of several layers of timber bonded together at right angles,” explains Piet Kerckhof. “This offers the freedom to create different building concepts, styles and architectural designs, as it also combines very well with other building materials. CLT is also ideally suited to disassembly and reuse. Other advantages include its high fire safety, the ability to provide up to 10% more living space within the same footprint, and its good insulating properties. Finally, there is its favourable CO2 balance: the timber felled for the holiday park had already removed 5.2 million kilograms of CO2 from the atmosphere, so in theory this offsets the associated transport for the next 25 years. This includes all the lorry journeys required to build the holiday park and the average distance future guests will travel by diesel car for their stay. To compensate for the use of timber, 1,750 new trees were also planted, helping to reduce CO2 further and produce oxygen.”
TECHNICAL SPECIFICATIONS
Client Life Tree Group (Sint-Martens-Latem)
Operator Roompot (Goes, Netherlands)
Architect Wood Architects (Aalter)
Main contractor(s) Ecostruct (Beervelde, building works) & APK Group (Pelt, earthworks and roadworks)
Question about this story? Ask your question
Wie aan Roompot Park Eksel werkte
- main contractorEcostructMentioned in High-performance façade system for attractive CLT holiday homes
- grond- en wegeniswerkenAPK GroupMentioned in High-performance façade system for attractive CLT holiday homes
- Architectural practiceWood ArchitectsMentioned in Building with timber: good for the environment and your wellbeing
- ClientLife Tree GroupIn this story
- UitbaterRoompotIn this story
Keep following this
Get an email when a new story is published. No account needed.
- ProjectRoompot Park Eksel
- SubjectSustainable construction
- CompanyLife Tree Group
- CompanyRoompot