Using BIM as a driver for timber construction
Text and images BeHeCON

As a structural engineering consultancy, BeHeCON has built up extensive expertise in calculating timber structures. This has led to a series of impressive projects, including a warehouse in Wervik built from CLT, where structural timber is the common thread. BIM was also used in almost all of these projects.
In the initial phase, the BIM model usually contains a simplified representation of the building. The focus is on the load-bearing structure and an analysis of the structural principles. This information allows the design team to compare and refine different options. The architect’s design can be assessed at an early stage against the possibilities offered by timber construction and optimised where necessary, for example by adjusting spans, grid dimensions or the structural build-up. These changes are immediately visible in the model. In this way, the design develops step by step into a technically and economically viable whole.
In the next phase, the BIM model is developed in greater detail. Connections between timber elements are given their exact form, service penetrations are added, and fixing details are worked out. The model thus evolves from a design tool into a digital construction guide. This digital preparation has a direct impact on the production and assembly of the timber structure.
A lasting partnership
From the preliminary design stage, BeHeCON works creatively, financially and in technical and economic terms with the client, property developer, architect and contractor. “We always scan the BIM model of the design for structural improvements that could increase efficiency,” says Bert Hertleer, founder and managing director of BeHeCON. “A lasting partnership enables us to achieve a positive outcome and deliver real added value for every member of the construction team. Smooth communication, service and quality are our priorities. In this respect, BIM offers significant added value. The challenge is to integrate the structural engineering into the coordinated architectural BIM model without compromising the architecture or aesthetics. Alongside optimising the project’s financial return through multiple knock-on savings, we also always aim for technical excellence: a smooth, practical and efficient construction process for the contractor on site. BIM implementation is a great help here too.”

Detailed engineering
BeHeCON’s engineers, who specialise in calculating timber structures, consistently deliver accurate, detailed and clear solutions, which are integrated into the design’s BIM model. They always aim to maximise the use of timber in the load-bearing structure, right down to wall beams and the stair and lift core, while optimising timber volumes economically. “Detailed engineering translated into a high-performance BIM model results in sustainable solutions that save on material use and reduce construction costs. Although timber stores CO2, the less structural timber and associated connections required, the smaller the ecological footprint of the design and the building. BIM delivers tangible added value in this respect,” stresses Bert Hertleer.
Question about this story? Ask your question
Keep following this
Get an email when a new story is published. No account needed.
- SubjectGeneral


















