Katoen Natie Hornhaven, Amsterdam | Sophisticated warehouse complex in the Port of Amsterdam

The Port of Amsterdam’s Hornhaven is busier than usual at the moment. Nine storage warehouses for bulk cocoa are rising at a remarkable pace for Katoen Natie. The 8.5-metre-high, 45-centimetre-thick cast-in-situ concrete walls pose a particular challenge, while the warehouses must be built in just six months.

Ivan Vinck: “When installing the foundations, we also incorporate the starter reinforcement.”
The Port of Amsterdam is the world’s largest port for cocoa handling and transhipment. Katoen Natie was determined to keep pace, investing in a brand-new storage site in the so-called Hornhaven. The complex covers around 45,000 square metres and comprises nine warehouses. ASK Romein was appointed to build them. “We have been carrying out projects for Katoen Natie on an ongoing basis for almost twenty years, both at home and abroad. In total, we have built more than 1.2 million square metres of storage warehouses. Over the years, a great deal of mutual trust has developed. It is no surprise, then, that Katoen Natie asked us to build the new storage warehouses in Amsterdam’s Hornhaven as well,” says managing director Ivan Vinck.
Concrete walls that require careful planning

ASK Romein builds the concrete walls in 51-metre-long sections.
The warehouses are generally of fairly conventional construction (foundation piles-foundations-concrete walls-concrete floor-steel frame-steel deck-roofing-façade cladding). What is far less conventional is the scale of the cast concrete walls. “They are no less than 8.5 metres high, and their thickness is equally impressive: they are 45 centimetres wide at the foundation blocks and 30 centimetres at the top,” explains Ivan Vinck. “Building these tapered walls is a story in itself. When installing the foundations, we also incorporate the starter reinforcement. We then build the walls up step by step, working in sections of 51 linear metres each time. After pouring, the concrete stays in the formwork for two days, then remains propped for a further two days. In other words, each concreting phase takes four days. Given the high stacking and the pressure loads from the cocoa, our engineers carried out a thorough study during the tendering phase to arrive at the most cost-effective and efficient design, fully integrating the foundations, concrete retaining walls and roof structure.”
No shortage of challenges

At the base, the tapered concrete walls are no less than 45 centimetres wide.
Even for an experienced company such as ASK Romein, which specialises in the construction of distribution centres, Katoen Natie Hornhaven is a unique project. “The first concrete wall was poured in the week of 7 to 13 January, and all the concrete walls should be finished by the end of April, so that the project can be fully completed by 5 July,” says Ivan Vinck. “This is an ambitious schedule. What is more, the concrete work is not evenly distributed. For example, the smallest of the nine warehouses, which is heavily compartmentalised, contains 50% of all the concrete walls. Another particular feature is the presence of underground tie rods alongside the existing quay wall, between which we have to install three thousand floor piles. In short, there is no shortage of challenges, and so far we are right on schedule!”