Contractor Vanderstraeten designs, builds, finances and maintains buildings in the public and private sectors. With the completion of three residential towers, Evereast in Evere, De Drie Kreeften in Leuven and Kleine Heide in Hoboken, the construction company has also established itself as a high-rise specialist.

“Organisation and coordination are crucial in high-rise construction,” says project manager Thomas. He coordinated the high-rise projects in Leuven and Hoboken. “You can only work as fast as the slowest link in the chain. Each stage builds on the one before it. On top of that, there is usually very little room to manoeuvre around tower blocks. That was the case in Leuven: on a site no bigger than a handkerchief, we had to fit all the cranes, building materials and machinery. It was a logistical tour de force. Projects like these require construction teams that are perfectly in sync. I’m really proud of the people who put in so much work in such a short time to meet the deadlines. They worked from morning until night, come rain or shine. The site was tidied up on Saturdays so that work could resume in an organised way the following Monday.”

The challenge in building Evereast in Evere lay in the varying underground levels.

De Drie Kreeften: a large building on a small footprint

Commissioned by social housing company Dijledal, Vanderstraeten built the De Drie Kreeften residential tower, next to AB InBev and between the Dijle and the Leuven ring road. The complex design also made for a complex build. The building has a footprint of just 550 square metres, a cantilever over the square and a fully concrete load-bearing structure cast in situ.

Thomas: “Normally, you work through a building from top to bottom, but that isn’t possible with a high-rise. To speed things up, we installed temporary weatherproofing. That meant we could start fitting the windows and carrying out the interior finishing on the first six floors while the structure was still being built higher up.”

Kleine Heide: strip-out and reconstruction

The Kleine Heide renovation project in Hoboken was also a special undertaking. It is one of nine residential towers from the 1970s that were due for a complete renovation. To reconfigure the space inside the building, Vanderstraeten removed the central core. The four wings were completely stripped out, but the structural frame was retained.

Thomas: “From a structural perspective, it was a major challenge. We fully shored up the wings and connected them to one another. During the reconstruction, we removed the braces one by one. The façade was given new brickwork, covering a total of 4,500 square metres. We also installed all the building services, from electrical and plumbing systems to lifts and solar collectors. We were responsible for the finishing work, including the painting, as well as planting the shared green spaces.”

To speed up the work, temporary weatherproofing was installed during construction of the De Drie Kreeften residential tower in Leuven.
In Hoboken, only the structural frames of the four wings remained standing.
Vanderstraeten renovated the Kleine Heide social housing tower in Hoboken.

Evereast: modelled entirely in 3D

Evereast has given Evere a new landmark on its skyline. Property developer Bouyges Immobilier opted for a residential tower with two wings, housing no fewer than 176 studios and apartments and four commercial units. The developer appointed Vanderstraeten to carry out the entire project, from demolition and structural work to finishing and landscaping.

Project manager Jef: “The biggest challenge on this project was underground. The tower has three basement levels, while the other buildings have one. There was also an existing underground car park. Connecting the different levels was a major challenge. Our in-house design team modelled the entire construction project in 3D. This allowed us to identify and resolve construction issues in advance. It also meant all the subcontractors were working from the same technical drawings.”

Evereast was designed with the future in mind. The façade can be fully dismantled, and the building’s plant room is large enough to accommodate additional equipment.

Vanderstraeten modelled the entire Evereast project in 3D in advance.

Question about this story? Ask your question

Keep following this

Get an email when a new story is published. No account needed.

What you follow
  • SubjectYearbook
Share this article

Follow Bouwen aan Vlaanderen

Follow

Follow a project or company and you’ll receive an email whenever a new story appears. Follow a theme or topic and you’ll receive a weekly roundup. No account or password needed: every email includes a link to what you follow.