Quartier Bleu, Hasselt | Ingenious control systems for electrical installations, fire detection and access control

Four hundred residential units across eleven apartment blocks, fifty commercial units and a three-level underground car park: no further explanation is needed to show that Quartier Bleu was a ‘megaproject’ in every respect. This was also true of the electrical installations, fire detection and access control, for which extensive integration was chosen. “Combined with the exceptional scale and the lean schedule, updated daily, this presented a considerable challenge,” says Matthijs Beckers, project manager and co-owner of Elektriciteitswerken Janssens.

“We received very positive feedback on the cable trays,” says Matthijs Beckers.
Elektriciteitswerken Janssens, based in Zonhoven, has specialised in electrical installations since 1985, has its own engineering and design department, and employs around thirty people. But a project like Quartier Bleu? This is highly unusual even for a very experienced company with a wealth of expertise. “We were responsible for the entire electrical installation in the underground private car park and all the apartments. We also handled fire detection in the communal areas of all the apartment blocks and throughout the underground car park, including all the associated links that lower the smoke screens and gates, activate the smoke and heat extraction systems, send the lifts to the evacuation level, stop the escalators, unlock all the doors, and control the fire dampers, barriers and aquifer thermal energy storage system… To top it all off, everything can be monitored via a digital alarm server. The private section of the underground car park is also equipped with around fifty electric vehicle charging points. Finally, we were also responsible for access control (badge readers in the underground car park) and video entry systems (both in the underground car park and in every apartment block). Behind all these systems is an ingenious control system that enables maximum integration and guarantees optimum performance,” explains Matthijs Beckers.
An intensive process
Extensive consultation with the main contractor and all the subcontractors involved, complex coordination of the work, lean planning with daily updates (daily stand-ups), and 3D modelling in the overarching BIM model of the underground car park…: the challenges were numerous during the months Elektriciteitswerken Janssens spent on the Quartier Bleu site. “It was a very intensive process, which will have taken a year and a half by the time it is complete,” concludes Matthijs Beckers. “We did encounter some disruption due to the coronavirus crisis, but we were fortunate that the site never had to close and that the project was already in the handover phase, making it easy to comply with the precautionary measures and the required ‘social distancing’. Our collaboration with Houben, STRABAG and all the other parties went extremely well, so we have positive memories of this challenging project!”
Question about this story? Ask your question
Wie aan Quartier Bleu werkte
- architectDe Gregorio & PartnersMentioned in Quartier Bleu, Hasselt | Pushing boundaries, literally and figuratively
- KWO-installatieIFTechMentioned in Quartier Bleu, Hasselt | Sustainable district heating and cooling thanks to an ingenious ATES system
- grond- en afbraakwerkenBaldewijnsMentioned in Quartier Bleu, Hasselt | 400,000 m³ of earthworks along Hasselt’s Kanaalkom
- electrical installationElektriciteitswerken JanssensIn this story
- engineering consultancyMACOBO-STABOMentioned in Quartier Bleu, Hasselt | Significantly lower costs thanks to technical and structural optimisations
- contractorTHV Houben-STRABAGMentioned in Quartier Bleu, Hasselt | Significantly lower costs thanks to technical and structural optimisations
- projectstenen
Nelissen SteenfabriekenMentioned in More than a million bespoke bricks for Quartier Bleu - elektrotechniekenJanssens ElektriciteitswerkenMentioned in Impressive fire detection system for Quartier Bleu
Keep following this
Get an email when a new story is published. No account needed.
- ProjectQuartier Bleu
- SubjectConstruction projects
- CompanyElektriciteitswerken Janssens