Quartier Bleu, Hasselt | Significantly lower costs thanks to technical and structural optimisations

A closer look at Quartier Bleu makes it immediately clear that it is a truly exceptional project. Its structural and building services engineering were no ordinary undertaking either. However, thanks to a cost-optimising structural study, MACOBO-STABO managed to save no less than 720 tonnes of reinforcing steel. The multidisciplinary engineering firm was also commissioned to handle the building services and EPB reporting.
The underground car park at Quartier Bleu is a story in itself. At the request of THV Houben-STRABAG, MACOBO-STABO optimised the design prepared at tender stage, which featured precast beams and floor units on piled foundations. “To speed up construction, streamline logistics and reduce costs, we opted for a raft foundation and cast-in-situ floor slabs,” says structural project manager Joachim Grochowczak.
20% less reinforcing steel
Houben and STRABAG Belgium used a 3D cascading system to build the underground car park as quickly and efficiently as possible, which also had implications for the design work. “Before the 30,000 m² raft foundation was fully completed, work had already begun on the level -2 structure at the other end of the site. We therefore had to schedule the delivery of our drawings to match the contractors’ work sequence. We also had to stay ahead of the construction work, so given the rapid pace of construction, we had to deploy a large team of structural specialists, both modellers and engineers, to get the job done.” MACOBO-STABO subsequently also reviewed the structure of the
superstructure. “We found that, in combination with the revised substructure, replacing the complex, oversized beam grid with a thick, cast-in-situ concrete slab would save 720 tonnes of reinforcing steel (20% less than in the original design) and therefore a considerable amount of money. This was beneficial not only structurally, but also in terms of construction,” says Joachim Grochowczak.

The structure of the superstructure was also modified, which was beneficial not only structurally, but also in terms of construction.
Quick to adapt
The structural optimisation of the superstructure also had a positive impact on the routing of the building services. “This meant fewer workarounds were needed to provide all the connections and conceal the pipes,” adds building services project manager Miche Wassink. “That was no small matter, as a geothermal energy storage system with a ring main to provide heating and cooling to all the buildings, combined with a connection to the canal water to maintain the energy balance underground, was challenging enough in itself. We also had to be highly flexible in the retail and hospitality
areas. As the retailers and their specific requirements often only became clear quite late, we had to make a great many changes at the last minute, such as moving connections and providing greater electrical capacity. It was a matter of adapting quickly to bring this
to a successful conclusion.” Finally, MACOBO-STABO also handled the EPB reporting. “By carrying out not only theoretical calculations, but also considering the economic aspects and practical feasibility, we can deliver significant added value. Quartier Bleu is another project that proves this,” concludes CEO Natalie Vanderschaeghe.
Een zakelijke vraag aan Macobo-Stabo? Get in touch
Wie aan Quartier Bleu werkte
- architectDe Gregorio & PartnersMentioned in Quartier Bleu, Hasselt | Pushing boundaries, literally and figuratively
- KWO-installatieIFTechMentioned in Quartier Bleu, Hasselt | Sustainable district heating and cooling thanks to an ingenious ATES system
- grond- en afbraakwerkenBaldewijnsMentioned in Quartier Bleu, Hasselt | 400,000 m³ of earthworks along Hasselt’s Kanaalkom
- electrical installationElektriciteitswerken JanssensMentioned in Quartier Bleu, Hasselt | Ingenious control systems for electrical installations, fire detection and access control
- contractorTHV Houben-STRABAGIn this story
- projectstenen
Nelissen SteenfabriekenMentioned in More than a million bespoke bricks for Quartier Bleu - elektrotechniekenJanssens ElektriciteitswerkenMentioned in Impressive fire detection system for Quartier Bleu
Keep following this
Get an email when a new story is published. No account needed.
- ProjectQuartier Bleu
- SubjectConstruction projects
- CompanyMacobo-Stabo
- CompanyTHV Houben-STRABAG



















