A brand-new information and community centre is currently being built in Dessel. The building, named ‘TABLOO’, promises to be an architectural gem. Its unique concrete ‘table structure’ will become a striking landmark in the Kempen landscape. The ‘legs’ were constructed using a modular formwork system to achieve the intended joint and tie-hole pattern and meet the strict aesthetic requirements for the fair-faced concrete.
TABLOO is due for completion in 2021 and is being built for NIRAS, the National Agency for Radioactive Waste and Enriched Fissile Materials. Thanks to an interactive exhibition, the centre is set to become the leading source of information on the management of radioactive waste and the notorious cAt disposal project. It will also serve as a tourist attraction for the region, offering a range of benefits to local communities. TABLOO will also house an auditorium that doubles as a theatre, with seating for two hundred people, a temporary exhibition space, several multi-purpose rooms and a large central square. The building will be set within an attractive landscaped park with an events field.

The project takes its name from its distinctive table structure. Nine smooth, flat, fair-faced concrete columns will support the upper floor of the visitors’ centre.
Immaculate fair-faced concrete
The project takes its name from its distinctive, 15-metre-high table structure. Nine smooth, flat, fair-faced concrete columns surround a timber base and support a ‘tabletop’ housing the upper floor of the visitors’ centre. As the concrete had to meet very strict aesthetic requirements (in accordance with CUR Recommendation 100), it was cast in situ using VARIO wall formwork. “The distinctive architecture called for a specific formwork system that would leave no visible screw marks,” says Cis Geysen, site manager at Groep Van Roey. “The flexibility of the modular VARIO GT 24 wall formwork enabled us to achieve the intended joint and tie-hole pattern to perfection. Another advantage is that the panels are pre-assembled at the PERI assembly hall in Schijndel and delivered to site ready to use. This saved us a great deal of time. And by using FinPly concrete plywood sheets in various standard sizes
we were able to limit the amount of offcut waste per sheet.”
Question about this story? Ask your question
Who worked on it
TABLOO in Dessel
- VARIO-wandbekistingPERI
Keep following this
Get an email when a new story is published. No account needed.
- ProjectTABLOO
- SubjectConstruction projects
- CompanyPERI